Close-out test system
First Claim
Patent Images
1. A method for providing line test results, the method comprising:
- receiving the line test results from a first client device;
storing the test results;
providing remote access to the test results;
providing the test results to an evaluation application;
performing close out tests by selecting from a group of operations;
receiving additional data associated with rerun tests that produce results within the test parameters; and
receiving an override indication; and
evaluating the test results for accuracy.
2 Assignments
0 Petitions
Accused Products
Abstract
The invention is a method and system conducting a completion test on a communications line. The system includes a testing device coupled to a remote device by a network. Line-test results are received from the testing device and made available to various client devices via the same or another network. Test data is automatically archived for analysis.
-
Citations
25 Claims
-
1. A method for providing line test results, the method comprising:
-
receiving the line test results from a first client device; storing the test results; providing remote access to the test results; providing the test results to an evaluation application; performing close out tests by selecting from a group of operations; receiving additional data associated with rerun tests that produce results within the test parameters; and receiving an override indication; and evaluating the test results for accuracy. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15)
-
-
16. A method for performing line tests on a communication line in a communication network, the method comprising:
-
initiating one or more line tests on a communication line; receiving test data that includes a set of line results received in response to running mandatory tests; providing said test data to an evaluation application; communicating the test results to a remotely accessible storage medium; evaluating the test results for accuracy; and presenting the test results on at least one presentation screen selected from the group consisting of;
a trouble report presentation screen, and a report resolution presentation screen. - View Dependent Claims (17, 18, 19, 20, 21, 22, 23, 24, 25)
-
Specification