1. A method of optimizing loads to be delivered on a particular date to a particular destination in response to a plurality of requisitions for various items to be delivered from various vendors to various destinations, said method comprising:
- Determining a demand for one or more items that are needed at a particular destination during a time period;
Identifying requisitions of the one or more items to be delivered to the particular destination from a vendor on a particular date corresponding to the time period;
Consolidating, by a processor, the requisitions for the particular date to create one or more optimized loads and a partial load, said created loads being optimized for container capacity;
Determining a horizon date subsequent to the particular date;
Consolidating, by a processor, the partial load with at least one requisition for a date later than the particular date but not later than the horizon date to create an additional optimized load, thereby creating a delivery schedule of optimized loads for the particular date; and
Displaying the delivery schedule of optimized loads on a display device, wherein an operator either confirms or edits the delivery schedule based on the displayed delivery schedule of optimized loads.
3 Assignments
0 Petitions
Accused Products
Abstract
A system and method of optimizing loads to be delivered on a particular date to a particular destination in response to a plurality of requisitions for various items to be delivered from various vendors to various destinations. Requisitions are arranged chronologically and line items are moved forward for early delivery to build optimized truck/container loads.
-
Citations
16 Claims
-
1. A method of optimizing loads to be delivered on a particular date to a particular destination in response to a plurality of requisitions for various items to be delivered from various vendors to various destinations, said method comprising:
-
Determining a demand for one or more items that are needed at a particular destination during a time period; Identifying requisitions of the one or more items to be delivered to the particular destination from a vendor on a particular date corresponding to the time period; Consolidating, by a processor, the requisitions for the particular date to create one or more optimized loads and a partial load, said created loads being optimized for container capacity; Determining a horizon date subsequent to the particular date; Consolidating, by a processor, the partial load with at least one requisition for a date later than the particular date but not later than the horizon date to create an additional optimized load, thereby creating a delivery schedule of optimized loads for the particular date; and Displaying the delivery schedule of optimized loads on a display device, wherein an operator either confirms or edits the delivery schedule based on the displayed delivery schedule of optimized loads. - View Dependent Claims (2, 3, 4, 5, 6)
-
-
7. A method of optimizing loads to be delivered on a particular date to a particular destination from a plurality of requisitions for various items from various vendors for various destinations, said method comprising:
-
Determining a demand for one or more items that are needed at a particular destination during a time period; Identifying requisitions of the one or more items to be delivered to the particular destination from a vendor on a particular date corresponding to the time period; Consolidating, by a processor, the requisitions for the particular date to create one or more optimized loads and a partial load, said created loads being optimized for container capacity; Determining a horizon date subsequent to the particular date; Consolidating, by a processor, the partial load with at least one requisition subsequent to the particular date but not subsequent to the horizon date to create an additional optimized load, thereby creating a delivery schedule of optimized loads for the particular date; and Displaying the delivery schedule of optimized loads on a display device, wherein an operator either confirms or edits the delivery schedule based on the displayed delivery schedule of optimized loads. - View Dependent Claims (8, 9, 10)
-
-
11. A method of consolidating a plurality of requisitions for various items from various vendors to be delivered to various destinations on or after a specified date to create one or more truckloads, each for delivery on the specified date or thereafter, said method comprising:
-
Identifying requisitions of items to be delivered on the specified date from a particular vendor to a particular destination; Consolidating, by a processor, the requisitions to create one or more optimized loads and a partial load, said created loads being optimized for container capacity; Determining a horizon date subsequent to the specified date; Consolidating, by a processor, the partial load with at least part of one or more requisitions for delivery on a date subsequent to the specified date but not subsequent to the horizon date to create an additional optimized load; Assigning the specified date as the delivery date for the additional optimized load, thereby creating a delivery schedule of optimized loads for the specified date; and Displaying the delivery schedule of optimized loads on a display device, wherein an operator either confirms or edits the delivery schedule based on the displayed delivery schedule of optimized loads. - View Dependent Claims (12, 13, 14)
-
-
15. A computer readable medium including instructions for consolidating a plurality of requisitions for various items from various vendors to be delivered to various destinations on or after a specified date to create one or more truckloads, each for delivery on the specified date or thereafter, said instructions comprising instructions for:
-
Identifying requisitions of items to be delivered on the specified date from a particular vendor to a particular destination; Consolidating the requisitions to create one or more optimized loads and a partial load, said created loads being optimized for container capacity; Determining a horizon date subsequent to the specified date; Consolidating the partial load with at least part of one or more requisitions for delivery on a date subsequent to the specified date but not subsequent to the horizon date to create an additional optimized load; Assigning the specified date as the delivery date for the additional optimized load, thereby creating a delivery schedule of optimized loads for the specified date; and Displaying the delivery schedule of optimized loads on a display device. - View Dependent Claims (16)
-