Method of planning train movement using a three step optimization engine
First Claim
Patent Images
1. A method of scheduling the use of a plurality of resources in a rail network in a first-time space domain having predetermined constraints, comprising:
- (a) transforming the network resources scheduling problem to a second domain by relaxing some of the predetermined constraints;
(b) measuring the historical performance of the scheduled network resources;
(c) performing a sensitivity analysis of the measured historical performance to identify the relative importance of a variable affecting the performance; and
(d) solving the scheduling problem as a function of the identified relative importance; and
(e) transforming the solved transformed network resources scheduling problem back to the first time-space domain.
1 Assignment
0 Petitions
Accused Products
Abstract
A method of scheduling network resources in a first domain by transforming the problem to a second domain, solving the problem and transforming back to the first domain.
85 Citations
7 Claims
-
1. A method of scheduling the use of a plurality of resources in a rail network in a first-time space domain having predetermined constraints, comprising:
-
(a) transforming the network resources scheduling problem to a second domain by relaxing some of the predetermined constraints; (b) measuring the historical performance of the scheduled network resources; (c) performing a sensitivity analysis of the measured historical performance to identify the relative importance of a variable affecting the performance; and (d) solving the scheduling problem as a function of the identified relative importance; and (e) transforming the solved transformed network resources scheduling problem back to the first time-space domain. - View Dependent Claims (2)
-
-
3. A method of scheduling the use of a plurality of resources in a rail network in a first domain having a set of predetermined constraints, comprising:
-
(a) transforming the network resources scheduling problem to a plurality of domains by relaxing the set of predetermined constraints; (b) for each of the plurality of domains; (i) measuring the historical performance of the scheduled network resources; (ii) performing a sensitivity analysis of the measured historical performance to determine the relative importance of a variable affecting the performance; (iii) identifying the most important variables using a predetermined criteria; (c) selecting the domain having the fewest number of identified important variables; (d) solving the transformed network resources problem in the selected domain; and (e) transforming the solved transformed network resources scheduling problem back to the first domain. - View Dependent Claims (4, 5)
-
-
6. A system for scheduling the use of a plurality of resources in a rail network in a first time-space domain having a predetermined set of constraints, comprising:
-
a database containing measurements of a historical performance of scheduled network resources; a processor programmed to; (i) transform the network resources scheduling problem to a second domain by relaxing the predetermined set of constraints; (ii) access the database to perform a sensitivity analysis of the measured historical performance to identify the relative importance of a variable affecting the performance; (iii) solve the scheduling problem as a function of the identified relative importance; (iv) transform the solved transformed network resources scheduling problem back to the first time-space domain. - View Dependent Claims (7)
-
Specification