×

Method and apparatus for swapping lead and remote locomotives in a distributed power railroad train

  • US 7,715,956 B2
  • Filed: 02/26/2005
  • Issued: 05/11/2010
  • Est. Priority Date: 02/27/2004
  • Status: Expired due to Fees
First Claim
Patent Images

1. A railroad train having at least two spaced-apart locomotives each capable of lead and remote operation, wherein a first locomotive operates as a lead unit for controlling operation of a second locomotive operating as a remote unit, and wherein the first and the second locomotives exchange information and commands over a communications channel controlled by a communications system, and wherein the train further comprises a plurality of rail cars, and wherein the first locomotive, the second locomotive and the rail cars each further comprise a pneumatic brake system for braking the train and having a brake pipe extending along the length of the train, a method for executing a swap function to change an operating status of the first locomotive from lead to remote and the operating status of the second locomotive from remote to lead, the method comprising:

  • determining whether current train operating conditions are acceptable for executing the swap function;

    responsive to an affirmative response to the determining step, issuing a service brake application for the first and the second locomotives and the rail cars, through the communications system;

    commanding the communications system to an idle mode without unlinking the train, wherein while the communications system is in the idle mode, the first and the second locomotives can issue an emergency brake application via the brake pipe responsive to an emergency situation;

    activating safety interlocks on the train;

    commanding the second locomotive to a transition state;

    configuring the first locomotive to a pseudo-remote operational state and the second locomotive to a pseudo-lead operational state;

    returning the communications system to a normal mode of operation;

    changing the operational state of the first locomotive to remote operation; and

    changing the operational state of the second locomotive to lead operation; and

    conducting a brake system test.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×