Information processing apparatus, control apparatus therefor, and control method therefor
First Claim
Patent Images
1. An information processing apparatus, comprising:
- a power-start initializing processing part configured to carry out hardware diagnosis processing in initializing processing when power supply in the information processing apparatus is started;
a power-off initializing processing part configured to carry out the hardware diagnosis processing when the power supply in the information processing apparatus is cut off;
a power-off timing control part configured to control timing of cutting off of the power supply in the information processing apparatus in a manner in which cutting off of the power supply in the information processing apparatus is carried out after the hardware diagnosis processing carried out by the power-off initializing processing part and trouble reporting processing are finished; and
a reporting part configured to carry out the trouble reporting processing to report to a predetermined remote monitoring center when a trouble is found out as a result of the hardware diagnosis processing carried out when the power supply in the apparatus is cut off by said power-off initializing processing part, wherein;
the power-off timing control part delays the timing of cutting off of the power supply in the information processing apparatus for a time during which the reporting processing can be completed, when said reporting part carries out the trouble reporting processing.
1 Assignment
0 Petitions
Accused Products
Abstract
An information processing apparatus carrying out hardware diagnosis processing by means of initializing processing of each part of hardware when power supply in the apparatus is started, has a power-off initializing processing part carrying out the hardware diagnosis processing when the power supply in the apparatus is cut off; and a power-off timing control part controlling timing of cutting off the power supply in the apparatus in such a manner that the power supply in the apparatus is carried out after the hardware diagnosis processing and trouble reporting processing carried out by said power-off initializing processing part are finished.
6 Citations
20 Claims
-
1. An information processing apparatus, comprising:
-
a power-start initializing processing part configured to carry out hardware diagnosis processing in initializing processing when power supply in the information processing apparatus is started; a power-off initializing processing part configured to carry out the hardware diagnosis processing when the power supply in the information processing apparatus is cut off; a power-off timing control part configured to control timing of cutting off of the power supply in the information processing apparatus in a manner in which cutting off of the power supply in the information processing apparatus is carried out after the hardware diagnosis processing carried out by the power-off initializing processing part and trouble reporting processing are finished; and a reporting part configured to carry out the trouble reporting processing to report to a predetermined remote monitoring center when a trouble is found out as a result of the hardware diagnosis processing carried out when the power supply in the apparatus is cut off by said power-off initializing processing part, wherein; the power-off timing control part delays the timing of cutting off of the power supply in the information processing apparatus for a time during which the reporting processing can be completed, when said reporting part carries out the trouble reporting processing. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A control apparatus configured to monitor states and operation of an information processing apparatus, comprising:
-
a power-start initializing processing part configured to carry out hardware diagnosis processing in initializing processing when power supply in the information processing apparatus is started; a power-off initializing processing part configured to carry out the hardware diagnosis processing when the power supply in the information processing apparatus is cut off; a power-off timing control part configured to control timing of cutting off of the power supply in the information processing apparatus in a manner in which cutting off of the power supply in the information processing apparatus is carried out after the hardware diagnosis processing carried out by the power-off initializing processing part and trouble reporting processing are finished; and a reporting part configured to carry out the trouble reporting processing to report to a predetermined remote monitoring center when a trouble is found out as a result of the hardware diagnosis processing carried out when the power supply in the information processing apparatus is cut off by said power-off initializing processing part, wherein; the power-off timing control part delays the timing of cutting off of the power supply in the information processing apparatus for a time during which the trouble reporting processing can be completed, when said reporting part carries out the trouble reporting processing. - View Dependent Claims (9, 10, 11, 12, 13)
-
-
14. A control method configured to monitor states and operation of an information processing apparatus, comprising:
-
carrying out hardware diagnosis processing in initializing processing when power supply in the information processing apparatus is started; carrying out the hardware diagnosis processing when the power supply in the information processing apparatus is cut off; controlling timing of cutting off of the power supply in the information processing apparatus in a manner in which cutting off of the power supply in the information processing apparatus is carried out after the hardware diagnosis processing in the carrying out the hardware diagnosis processing when the power supply in the information processing apparatus is cut off and trouble reporting processing are finished; and carrying out the trouble reporting processing to report to a predetermined remote monitoring center when a trouble is found out as a result of the hardware diagnosis processing carried out when the power supply in the apparatus is cut off in the carrying out the hardware diagnosis processing when the power supply in the information processing apparatus is cut off, wherein; the controlling timing delays the timing of cutting off of the power supply in the information processing apparatus in a manner in which the trouble reporting processing can be completed, when the carrying out the trouble reporting processing carries out the trouble reporting processing. - View Dependent Claims (15, 16, 17, 18, 19, 20)
-
Specification