1. A method for installing siding panels to a building comprises the steps of:
- providing a foam backing board having predetermined dimensions having a flat back side for supporting against a wall of the building and a contour cut alignment configuration on the front side;
establishing a reference line at the bottom of the wall for aligning and positioning the foam backing board for a first course of the backing board;
laying a first lower edge of a first backing board along the reference line and tacking the first backing board into position;
laying subsequent backing boards in sequence horizontally adjacent to a previously tacked backing board to complete the first course; and
installing at least one siding panel over at least a portion of the first backing board.
4 Assignments
0 Petitions
Accused Products
Abstract
A method for installing siding panels to a building includes providing a foam backing board having alignment ribs on a front surface and a drainage grid on a back surface and then establishing a reference line at a lower end of the building for aligning a lower edge of a first backing board and tacking thereon. Tabs and slots along vertical edges of the foam backing board align and secure adjacent backing boards to each other. A siding panel is butted against one of the lower alignment ribs and secured thereto. Another siding panel is butted against and secured to an adjacent alignment rib to form a shadow line between the adjacent siding panels on the building.
-
Citations
29 Claims
-
1. A method for installing siding panels to a building comprises the steps of:
-
providing a foam backing board having predetermined dimensions having a flat back side for supporting against a wall of the building and a contour cut alignment configuration on the front side; establishing a reference line at the bottom of the wall for aligning and positioning the foam backing board for a first course of the backing board; laying a first lower edge of a first backing board along the reference line and tacking the first backing board into position; laying subsequent backing boards in sequence horizontally adjacent to a previously tacked backing board to complete the first course; and installing at least one siding panel over at least a portion of the first backing board. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29)
-
Specification