×

Maintenance system and method

  • US 7,774,169 B2
  • Filed: 06/29/2006
  • Issued: 08/10/2010
  • Est. Priority Date: 06/29/2006
  • Status: Active Grant
First Claim
Patent Images

1. A maintenance system adapted for making a maintenance plan for consumable parts of an apparatus that is a maintenance target, comprising:

  • an interval information acquiring unit configured to acquire information related to a combination of a visit interval that prescribes a time interval at which a visit should be made for maintenance operation for each consumable part, and a replacement interval, associated with the visit interval, that prescribes a time interval at which each consumable part should be replaced;

    a counter value acquiring unit configured to acquire a counter value that indicates actual use of consumable parts in the apparatus; and

    a maintenance plan calculating unit configured to calculate timing at which a next visit should be made for the apparatus, and a consumable part that should be replaced at the timing, on the basis of the information acquired by the interval information acquiring unit and the counter value acquired by the counter value acquiring unit.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×