Brownfield workflow and production forecast tool
First Claim
1. A computer-based method for conducting a technical assessment phase of a brownfield assessment plan, comprising:
- determining an optimal set of engineering tasks to be performed in said technical assessment phase, wherein said engineering tasks to be performed are based at least on well, operations, and facilities data;
performing an analysis of said well, operations, and facilities data, said analysis based on one or more of the following;
well information, historical well data, and geological well data, wherein said analysis includes generating infill, injection, workover and reactivation candidates, and one or more production forecasts;
determining an optimal order for performing said optimal set of engineering tasks in said technical assessment phase; and
enforcing performance of said optimal set of engineering tasks in said optimal order for subsequent technical assessment phases of subsequent brownfield assessment plans;
wherein said optimal set of engineering tasks and said optimal order are determined based on expert knowledge and best practices identified from performance of previous brownfield assessment plans.
1 Assignment
0 Petitions
Accused Products
Abstract
Computer-based method and system are disclosed for conduction a brownfield assessment. The system/method involves a workflow manager that standardizes the tasks needed to be performed during the brownfield assessment and streamlines the completion of these tasks. The workflow manager incorporates expert knowledge and best practices identified over time for previous brownfield assessments. The expert knowledge and best practices are then applied automatically through operation of the workflow manager. Such an arrangement can result in significantly reduced completion time as well as more consistent deliverables from engineer to engineer and project to project.
17 Citations
21 Claims
-
1. A computer-based method for conducting a technical assessment phase of a brownfield assessment plan, comprising:
-
determining an optimal set of engineering tasks to be performed in said technical assessment phase, wherein said engineering tasks to be performed are based at least on well, operations, and facilities data; performing an analysis of said well, operations, and facilities data, said analysis based on one or more of the following;
well information, historical well data, and geological well data, wherein said analysis includes generating infill, injection, workover and reactivation candidates, and one or more production forecasts;determining an optimal order for performing said optimal set of engineering tasks in said technical assessment phase; and enforcing performance of said optimal set of engineering tasks in said optimal order for subsequent technical assessment phases of subsequent brownfield assessment plans; wherein said optimal set of engineering tasks and said optimal order are determined based on expert knowledge and best practices identified from performance of previous brownfield assessment plans. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. A computer-based system for conducting a technical assessment phase of a brownfield assessment plan, comprising:
-
a processor;
a system bus connected to said processor;
a storage medium connected to said system bus, said storage medium having computer-readable instructions stored thereon for causing said processor to;define an optimal set of engineering tasks to be performed in said technical assessment phase, wherein said engineering tasks to be performed are based at least on well, operations, and facilities data; perform an analysis of said data said analysis based on one or more of the following;
well information, historical well data, and geological well data, wherein said analysis includes generating infill, injection, workover and reactivation candidates, and one or more production forecasts;define an optimal order for performing said optimal set of engineering tasks in said technical assessment phase; and enforce performance of said optimal set of engineering tasks in said optimal order for subsequent technical assessment phases of subsequent brownfield assessment plans; wherein said optimal set of engineering tasks and said optimal order are determined based on expert knowledge and best practices identified from performance of previous brownfield assessment plans. - View Dependent Claims (11, 12, 13, 14, 15, 16, 17, 18)
-
-
19. A computer-readable storage medium for conducting a technical assessment phase of a brownfield assessment plan comprising instructions which, when executed, cause a computing device to:
-
define an optimal set of engineering tasks to be performed in said technical assessment phase; define an optimal order for performing said optimal set of engineering tasks in said technical assessment phase; and enforce performance of said optimal set of engineering tasks in said optimal order for subsequent technical assessment phases of subsequent brownfield assessment plans; wherein said optimal set of engineering tasks comprises pressure modeling, reservoir data petrophysics, and heterogeneity index efficiency analysis. - View Dependent Claims (20, 21)
-
Specification