×

Dragline bucket, rigging and system

  • US 7,774,959 B2
  • Filed: 01/21/2009
  • Issued: 08/17/2010
  • Est. Priority Date: 01/23/2008
  • Status: Active Grant
First Claim
Patent Images

1. A process for mining a site comprisingproviding a dragline bucket having a height, a length, a bottom wall with an inside surface, a pair of sidewalls, a rear wall, a cavity with a capacity for earthen material of at least 30 cubic yards, and a lip fixed to a front edge of the bottom wall and including a leading edge,wherein each said sidewall includes a bottom edge that connects to the bottom wall and a top rail opposite the bottom edge, and the height is an average of the distance between the inside surface of the bottom wall at the front edge and the top rail excluding any cutback at the rear wall and any upward extension of an arch support or dump line support,wherein each sidewall supports a hitch pin for connecting to a drag chain, and a hitch pin height is a vertical distance between the inside surface of the bottom wall at the front edge and a longitudinal axis of the hitch pin,wherein the length is a horizontal distance between an average forward position of the leading edge and a rearmost position of the cavity,wherein a ratio of the hitch pin height to the height is at least about 0.3,wherein a height to length ratio is between a range of 0.4 to 0.62, andusing a prime mover and drag ropes to apply a pulling force to the drag chains connected to the dragline bucket to pull the dragline bucket forward to collect earthen material into the cavity wherein a straight drag line extending between the hitch pin and a point where the drag ropes reach the prime mover is at angle of no more than about 45 degrees below tub.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×