×

System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for block size

  • US 7,792,616 B2
  • Filed: 03/23/2006
  • Issued: 09/07/2010
  • Est. Priority Date: 12/30/2005
  • Status: Active Grant
First Claim
Patent Images

1. A method using a processor for computing car switching solutions in a railway switch yard containing a switch, a plurality of classification tracks and a reswitching track, the reswitching track defining a path that re-circulates cars from a position downstream the switch to a position upstream the switch, said method comprising:

  • a) receiving at an input first data conveying information about a size of a given train block to be assembled by the switch yard;

    b) computing with the processor a car switching solution for one or more cars of the given train block, wherein a computation of a car switching solution includes a selection of at least one car switching option among a set of car switching options, one car switching option of the set including switching the car of the given train block to a classification track and another car switching option of the set including switching the car of the given train block to the reswitching track;

    c) using during said computing the information about the size of the given train block as a factor in selecting between a car switching option to switch the car to a classification track and a car switching option to switch the car to the reswitching track;

    d) releasing at an output second data conveying the car switching option selected on a basis of said computing.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×