×

Risk-based design and maintenance systems and methods

  • US 7,840,376 B2
  • Filed: 03/20/2008
  • Issued: 11/23/2010
  • Est. Priority Date: 03/20/2008
  • Status: Active Grant
First Claim
Patent Images

1. A computer-based method for determining an optimal inspection schedule for a structure, said method comprising:

  • determining a crack size distribution table for the structure by a computer using the location and inspection data;

    determining a plurality of risk values for the structure by the computer, each risk value for a different estimated usage hours of the structure and based on said crack size distribution table;

    estimating, by the computer, a first inspection interval based on a predetermined risk value threshold input into the user interface; and

    determining, by the computer, a second inspection interval based on analyzing the rate of increase of risk value and probability of detection of a crack in said first inspection interval.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×