Seamless air traffic control (ATC) datalink transfers
First Claim
1. A method for transferring air traffic control over an aircraft, comprising:
- receiving a new air traffic control center designation from an original air traffic control center through an active connection, wherein the active connection is based on a first data link standard;
initiating control transfer by at least one of an aircraft logon to a new air traffic control center and a contact between the original and new traffic control centers;
establishing an inactive connection between the new air traffic control center and the aircraft based on a second link standard;
confirming the establishment of an inactive connection from the aircraft to the new air traffic control center; and
terminating the active connection between the original air traffic control center and the aircraft.
1 Assignment
0 Petitions
Accused Products
Abstract
Embodiments for seamless air traffic control (ATC) data link transfers are disclosed. In at least one embodiment, a method includes receiving a new air traffic control center designation from an original air traffic control center through an active connection. The active connection is based on a first data link standard. The method further includes initiating control transfer by at least one of an aircraft logon to a new air traffic control center or a contact between the original and new traffic control centers. The method additional includes establishing an inactive connection between the new air traffic control center and the aircraft based on a second link standard. The method also includes confirming the establishment of an inactive connection from the aircraft to the new air traffic control center. Additionally, the method includes terminating the active connection between the original air traffic control center and the aircraft.
44 Citations
17 Claims
-
1. A method for transferring air traffic control over an aircraft, comprising:
-
receiving a new air traffic control center designation from an original air traffic control center through an active connection, wherein the active connection is based on a first data link standard; initiating control transfer by at least one of an aircraft logon to a new air traffic control center and a contact between the original and new traffic control centers; establishing an inactive connection between the new air traffic control center and the aircraft based on a second link standard; confirming the establishment of an inactive connection from the aircraft to the new air traffic control center; and terminating the active connection between the original air traffic control center and the aircraft. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. A method for transferring air traffic control over an aircraft, comprising:
-
receiving a new air traffic control center designation from an original air traffic control center through an active connection, wherein the active connection is based on a first data link standard; initiating control transfer by at least one of an aircraft logon to a new air traffic control center and a contact between the original and new traffic control centers; establishing an inactive connection between the new air traffic control center and the aircraft based on a second link standard; confirming the establishment of an inactive connection from the aircraft to the new air traffic control center; and terminating the active connection between the original air traffic control center and the aircraft, wherein the first data link standard is one of a Future Air Navigation System (FANS) standard and an Aeronautical Telecommunication Network (ATN) standard, and wherein the second data link standard is one of a FANS standard and an ATN standard, - View Dependent Claims (11, 12, 13, 14, 15, 16, 17)
-
Specification