×

Integration of an operative standalone router into a multi-chassis router

  • US 7,899,930 B1
  • Filed: 02/08/2008
  • Issued: 03/01/2011
  • Est. Priority Date: 08/31/2005
  • Status: Active Grant
First Claim
Patent Images

1. A router comprising:

  • a first operative switch fabric, wherein the first switch fabric forms one or more standalone switch planes; and

    a second operative switch fabric, wherein the second switch fabric combines with a third switch fabric to form one or more additional switch planes, wherein the third switch fabric is external to the router,wherein the third switch fabric is included in a second router that is a centralized control node of a multi-chassis router, further comprising a set of packet forwarding engines, wherein the set of packet forwarding engine receive routing information via one or more links to a centralized routing engine in the centralized control node.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×