Time updating and load management systems
First Claim
Patent Images
1. A master generator located in a building to update time data of devices in the building, the master generator comprising:
- an acquisition module configured to acquire time data representing current time of day;
a clock module configured to (i) receive the time data from the acquisition module, (ii) store the time data, and (iii) periodically update the time data;
an encoding module configured to encode the time data from the clock module into time messages;
a transmission module configured to selectively superimpose the time messages onto a power signal of the building for transmission to the devices; and
a load control module configured to generate load control commands based on load control instructions,wherein the acquisition module receives the load control instructions,wherein the encoding module encodes the load control commands into load control messages,wherein the transmission module superimposes the load control messages onto the power signal for transmission to the devices, andwherein the load control module is configured to (i) control a dryer using the load control commands, (ii) receive a humidity signal indicating a humidity level, and (iii) in response to the humidity level being above a predetermined threshold, use the load commands to selectively disable the dryer until the humidity level is below the predetermined threshold.
6 Assignments
0 Petitions
Accused Products
Abstract
A master generator that updates time data of remote devices comprises an acquisition module, a clock module, an encoding module, and a transmission module. The acquisition module acquires time data representing current time of day. The clock module receives and stores the time data from the acquisition module and periodically updates the time data. The encoding module encodes the time data from the clock module into time messages. The transmission module selectively superimposes the time messages onto a power signal.
28 Citations
53 Claims
-
1. A master generator located in a building to update time data of devices in the building, the master generator comprising:
-
an acquisition module configured to acquire time data representing current time of day; a clock module configured to (i) receive the time data from the acquisition module, (ii) store the time data, and (iii) periodically update the time data; an encoding module configured to encode the time data from the clock module into time messages; a transmission module configured to selectively superimpose the time messages onto a power signal of the building for transmission to the devices; and a load control module configured to generate load control commands based on load control instructions, wherein the acquisition module receives the load control instructions, wherein the encoding module encodes the load control commands into load control messages, wherein the transmission module superimposes the load control messages onto the power signal for transmission to the devices, and wherein the load control module is configured to (i) control a dryer using the load control commands, (ii) receive a humidity signal indicating a humidity level, and (iii) in response to the humidity level being above a predetermined threshold, use the load commands to selectively disable the dryer until the humidity level is below the predetermined threshold. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44)
-
-
19. A method for operating a controller in a building, the method comprising:
-
acquiring time data representing current time of day; storing and periodically updating the time data; encoding the time data into time messages; selectively superimposing the time messages onto a power signal of the building for transmission to devices of the building; receiving load control instructions at the controller in the building; generating load control commands based on the load control instructions; encoding the load control commands into load control messages; selectively superimposing the load control messages onto the power signal for transmission from the controller to the devices; controlling a dryer in the building; receiving a humidity signal indicating a humidity level; and in response to the humidity level being above a predetermined threshold, using the load control commands to selectively disable the dryer until the humidity level is below the predetermined threshold. - View Dependent Claims (20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 45, 46, 47, 48, 49, 50, 51, 52, 53)
-
Specification