×

Method to improve requirements, design manufacturing, and transportation in mass manufacturing industries through analysis of defect data

  • US 7,945,426 B2
  • Filed: 05/22/2010
  • Issued: 05/17/2011
  • Est. Priority Date: 01/12/2006
  • Status: Expired due to Fees
First Claim
Patent Images

1. A computer node in a network, said computer node comprising:

  • a central processing unit;

    a network interface coupled with the central processing unit for enabling communication with other computer nodes in the network;

    a storage device;

    a database; and

    a memory comprising logic for;

    receiving an http request;

    determining which handler among a plurality of handlers to invoke in order to process the request; and

    invoking the handler;

    wherein the handler is one of;

    an error data collection handler for collecting error data comprising a symptom relating to the product, and storing the error data in the database;

    an error data classification handler for classifying the error data and storing results of the classifying in the database;

    an analysis handler for using the classified error data stored in the database for;

    mapping the symptom to a revealing condition by classifying the symptom into at least one attribute based on a phase of error injection and a scope of a fix for the error, an action, and a duration of ownership;

    wherein said symptom includes as an attribute a service context in which a given defect was found, wherein said service context comprises;

    scheduled maintenance, non-scheduled maintenance, and product recall;

    mapping the revealing condition to a test type; and

    mapping the scope of the fix to the phase of error injection; and

    a suggested actions report handler for recommending modifications to an end user for at least one of the design, testing, manufacture, and delivery of the product, wherein said recommended modifications comprise;

    addition of a new test phase, an indication of whether or not a given produce is ready for public sale, and justifications for the given recommendations.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×