×

Event-based power management for seismic sensors

  • US 8,019,549 B2
  • Filed: 12/10/2008
  • Issued: 09/13/2011
  • Est. Priority Date: 12/10/2008
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method of event-based power management for seismic sensors, the method comprising:

  • measuring seismic activity with a seismic sensor;

    comparing measured seismic activity from the seismic sensor against at least one criteria;

    when the measured seismic activity does not satisfy the at least one criteria, maintaining a signal processing circuit in a deactivated state;

    when the measured seismic activity satisfies the at least one criteria, activating the signal processing circuit and analyzing the measured seismic activity using the signal processing circuit; and

    entering a functional mode based on analyzing the measured seismic activity.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×