×

Method for forming monitored concrete pilings using a pour diverter

  • US 8,061,037 B2
  • Filed: 12/15/2006
  • Issued: 11/22/2011
  • Est. Priority Date: 12/15/2005
  • Status: Active Grant
First Claim
Patent Images

1. A method for casting a piling comprising:

  • positioning a plurality of pile strands in a form;

    connecting a suspension assembly having a sensor that is at least one of an accelerometer or a strain gauge to at least one of the pile strands so that the at least one sensor is located in a piling core area;

    positioning a pour diverter over the suspension assembly;

    pouring concrete over the pour diverter, which shields the suspension assembly from a direct flow of the concrete, and into the form; and

    removing the pour diverter.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×