×

On-site power plant control including adaptive response to transient load requirements

  • US 8,065,040 B2
  • Filed: 12/19/2005
  • Issued: 11/22/2011
  • Est. Priority Date: 12/19/2005
  • Status: Active Grant
First Claim
Patent Images

1. A method of controlling an on-site power plant that has a plurality of prime movers for generating power, comprising:

  • operating a plurality of prime movers to generate a first level of power for a load; and

    adjusting how the prime movers operate responsive to a down transient in the load while continuing operating at least one of the plurality of prime movers to generate a second, lower level of power for the load.

View all claims
  • 6 Assignments
Timeline View
Assignment View
    ×
    ×