×

Predictive cost reduction based on a thermodynamic model

  • US 8,069,122 B2
  • Filed: 03/20/2008
  • Issued: 11/29/2011
  • Est. Priority Date: 03/20/2007
  • Status: Active Grant
First Claim
Patent Images

1. A cost reduction system comprising:

  • a computer-readable storage medium storing a thermodynamic model that is configured to determine a predictive cost reduction for a process, the predictive cost reduction being derived from thermodynamic principles;

    a processor configured to;

    access parameters associated with a process, the parameters comprising;

    a quantity of units of work-in-process at first and second times, andfirst and second constants respectively indicative of growth between the first and second times, and of a reduction of the work-in-process to a reduction of cost,apply the thermodynamic model to the accessed parameters, anddetermine a predictive cost reduction associated with a contemplated improvement of the process, using;

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×