Apparatus for laying concrete metal pipes inverts and method for using the same
First Claim
1. An apparatus for laying concrete in metal pipe inverts comprising:
- a frame including a pair of runners having a forward end and a rearward end;
a trough connected between said runners proximate said forward end of said runners;
at least one support arm connected to said runners opposite said trough;
a concrete chute having a proximal end and a distal end, said proximal end traversing said trough and distal end supported by said at least one support arm; and
a primary scraper adjustably connected to said distal end of said chute and selectively extending toward said runners to spread concrete distributed from said trough in the metal pipe invert.
0 Assignments
0 Petitions
Accused Products
Abstract
An apparatus and method for repairing failed metal pipe inverts includes an apparatus for distributing concrete that is positioned at one entrance of the metal pipe invert. The apparatus includes a frame having a forward end and a rearward end. A trough is connected to the forward end, and a support arm is connected to said rearward end. One end of a chute traverses the trough, while the other is supported by the support arm. A scraper is to the chute to spread concrete distributed from the trough into the pipe invert. The concrete is poured into the chute and distributed into the trough. The apparatus is pulled through the metal pipe invert to distribute concrete from an opening in the trough onto the metal pipe invert. The scraper engages the concrete to selectively spread the concrete on the metal pipe invert and repair the invert.
11 Citations
19 Claims
-
1. An apparatus for laying concrete in metal pipe inverts comprising:
-
a frame including a pair of runners having a forward end and a rearward end; a trough connected between said runners proximate said forward end of said runners; at least one support arm connected to said runners opposite said trough; a concrete chute having a proximal end and a distal end, said proximal end traversing said trough and distal end supported by said at least one support arm; and a primary scraper adjustably connected to said distal end of said chute and selectively extending toward said runners to spread concrete distributed from said trough in the metal pipe invert. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. An apparatus for distributing concrete from an existing source of concrete onto an inner surface of a metal pipe invert, the apparatus comprising:
-
a frame having a forward end and a rearward end; a receptacle having a base and surrounding wall, said receptacle connected to said forward end between said frame; at least one buttressing arm connected between said forward end of said frame; a duct having a proximal end traversing said trough and a distal end supported by said at least one buttressing arm; and a primary flange connected to said distal end of said duct to spread concrete distributed from said trough onto the pipe invert. - View Dependent Claims (9, 10, 11, 12, 13, 14, 15)
-
-
16. A method for repairing failed metal pipe inverts comprising the steps of:
-
a) positioning an apparatus for distributing concrete at one entrance of the metal pipe invert, said apparatus including a frame including a pair of runners having a forward end and a rearward end;
a trough connected to said forward end between said runners, said trough having a base and surrounding wall, at least one support arm connected between said forward end of said runners, and a chute having a proximal end traversing said trough and a distal end supported by said at least one buttressing arm; and
a flexible scraper connected to said distal end of said chute to spread concrete distributed from said trough into the pipe invert;b) pouring concrete into said chute from a source of concrete; c) distributing the concrete from said chute into said trough; d) driving said apparatus through the metal pipe invert in a first direction; e) distributing concrete from an opening in said trough onto the metal pipe invert; and f) engaging the concrete with the scraper to selectively spread the concrete on the metal pipe invert. - View Dependent Claims (17, 18, 19)
-
Specification