Waste disposal during pit mining
First Claim
Patent Images
1. A method of open pit mining with waste dumping, comprising:
- extracting material from the open pit and determining whether the material is sent to any one or more of stockpiling, waste and processing;
defining a road network interconnecting a plurality of zones;
determining with a processor waste movement along the network from its origin being the zone in which the waste was produced to a destination being the zone in which the waste is to be dumpedeach zone containing a plurality of blocks, material extracted from one of the blocks in a zone being sent to a predetermined entry point on the road network, moving the material across the network and depositing the waste material in at least one external waste dump as determined by the processor, and some of the waste material being determined by the processor to be moved on the road network to terminate at one of the zones within the pit, and the processor allocating the material moved to one of the zones within the pit proportionally to an in pit waste dump defined by a refill aggregate that overlaps with that zone, the refill aggregate being a space formed after extraction of material from that aggregate and therefore cleared of original material and after any refill aggregate which sits below that aggregate has been completely refilled; and
jointly optimizing the extraction of material and movement of waste with the processor to optimize the net value of a joint extraction and waste movement schedule.
1 Assignment
0 Petitions
Accused Products
Abstract
A method, apparatus and computer program for pit mining with waste dumping is disclosed, in which material is extracted from an open pit and some of that material is sent to waste. The method optimises a joint extraction and waste refill schedule.
4 Citations
16 Claims
-
1. A method of open pit mining with waste dumping, comprising:
-
extracting material from the open pit and determining whether the material is sent to any one or more of stockpiling, waste and processing; defining a road network interconnecting a plurality of zones; determining with a processor waste movement along the network from its origin being the zone in which the waste was produced to a destination being the zone in which the waste is to be dumped each zone containing a plurality of blocks, material extracted from one of the blocks in a zone being sent to a predetermined entry point on the road network, moving the material across the network and depositing the waste material in at least one external waste dump as determined by the processor, and some of the waste material being determined by the processor to be moved on the road network to terminate at one of the zones within the pit, and the processor allocating the material moved to one of the zones within the pit proportionally to an in pit waste dump defined by a refill aggregate that overlaps with that zone, the refill aggregate being a space formed after extraction of material from that aggregate and therefore cleared of original material and after any refill aggregate which sits below that aggregate has been completely refilled; and jointly optimizing the extraction of material and movement of waste with the processor to optimize the net value of a joint extraction and waste movement schedule. - View Dependent Claims (2, 3, 4)
-
-
5. A method of open pit mining with waste dumping, comprising:
-
extracting material from an open pit and determining some proportion of the extracted material to go to waste; defining a road network having a plurality of nodes, at least some of the nodes defining entry points to a plurality of waste dumps, and wherein the waste dumps are selected from the group of at least one in pit waste dump and at least one external waste dump; and moving the material to go to waste along the network of roadways from a location in the pit to an entry node relating to one of the waste dumps as determined by a processor and depositing the material to go to waste at the waste dump as determined by the processor; and jointly optimizing the extraction of material and movement of waste with the processor to provide a joint extraction and waste movement strategy which optimises the net value of a joint extraction and waste movement schedule, wherein the step of extracting material comprises extracting material based on a block model extraction schedule, and wherein the waste dump comprises an in pit waste dump defined by a space in the pit which is determined by the processor from one or more blocks of the block model which have already been subject to extraction. - View Dependent Claims (6, 7, 8, 9, 10, 11, 12)
-
-
13. An apparatus for scheduling open pit mining with waste dumping, wherein material is extracted from an open pit and a determination is made that some proportion of the extracted material is to go to waste, a road network is provided having a plurality of nodes, at least some of the nodes defining entry points to a plurality of waste dumps, and wherein the waste dumps are selected from the group of at least one in pit waste dump and at least one external waste dump, and material to go to waste is moved along the network of roadways from a location in the pit to an entry node relating to one of the waste dumps and depositing the material to go to waste at the waste dump, the apparatus comprising:
a processor for dividing the pit into a plurality of zones, for allocating the material to be moved to one of the zones within the pit proportionally to an in pit waste dump defined by a refill aggregate that overlaps with that zone, the refill aggregate being a space formed after extraction of material from that aggregate and therefore cleared of original material and after any refill aggregate which sits below that aggregate has been completely refilled, and for providing a joint extraction and waste movement strategy which optimises the net value of a joint extraction and waste movement schedule.
-
14. A method of generating a schedule of open pit mining with waste dumping, comprising:
-
defining a road network interconnecting a plurality of zones; scheduling extraction of material from the open pit by determining with a processor whether the material is to be sent to any one or more of stockpiling, waste and processing; scheduling waste movement by determining with a processor waste movements for material to be extracted as waste, such that extracted waste will be moved along the network from an origin zone in which the waste was produced to a destination zone in which the waste is to be dumped, some waste material extracted from a specific origin zone being sent to a predetermined entry point on the road network, moved across the network and deposited in at least one external waste dump, and other waste material from the specific origin zone being moved on the road network to terminate at a destination zone within the pit, whereafter the other material is allocated proportionally to an in pit waste dump defined by a refill aggregate that overlaps with that destination zone, the refill aggregate being a space formed after extraction of material from that aggregate and therefore cleared of original material and after any other refill aggregate which sits below that refill aggregate has been completely refilled; and jointly optimising with the processor the scheduling of extraction of material and the scheduling of waste movement of extracted waste. - View Dependent Claims (15, 16)
-
Specification