×

Developments in or relating to system prognostics

  • US 8,103,392 B2
  • Filed: 03/27/2009
  • Issued: 01/24/2012
  • Est. Priority Date: 05/12/2008
  • Status: Active Grant
First Claim
Patent Images

1. A method of mitigating a system-level effect of a fault detected in a system during an operating period, the method comprising:

  • using a controller to automatically prognose the system-level effect of said fault in terms of a residual capability of the system during a remainder of the operating period based on predetermined stored data;

    using the controller to automatically generate a corresponding set of alternative reversionary action plans for mitigating said system-level effect during the remainder of the operating period based on said prognosis, wherein each reversionary action plan includes a first projected outcome if a current setting for a mitigation parameter is not adjusted, a proposed adjustment to the current setting for the mitigation parameter and a time frame for reaching the first projected outcome;

    submitting the set of alternative reversionary action plans to a decision-making authority for determination by the decision-making authority of a preferred one of the reversionary action plans suitable for achieving an objective; and

    using the controller, operably connected to the system, to implement a preferred reversionary action plan in accordance with said determination.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×