1. An activity scheduling tool accessible to the crew of a space vehicle, comprising:
- a first user interface element adapted to receive from a crew member of the space vehicle an indication that a task is to be scheduled or rescheduled, and an indication of at least one level of vehicle resources required for the task;
a second user interface element adapted to provide to the crew member of the space vehicle an indication that the task can or cannot be scheduled within the bounds of a dependency, condition, or vehicle resource associated with the task, wherein the second user interface element includes an indication that the task has been scheduled for an appointed time, and further includes a graphical display of available vehicle resources at the appointed time; and
wherein the second user interface element displays a mission timeline, the mission timeline providing at least one time reference selected from the group consisting of;
mission elapsed time (“
MET”
), coordinated universal time (“
UTC”
) and the time at Mission Control Center (“
MCC”
);
wherein said first user interface element and said second user interface element are generated on at least one particular machine and tangibly displayed on at least one display device, said at least one particular machine comprising at least one physical computing device.
1 Assignment
0 Petitions
Accused Products
Abstract
An automated tool for scheduling tasks to be performed based on resources available in a constrained environment. The tool gives crew members, employees, or others responsible for the performance of tasks in the constrained environment the power to adjust task schedules to take projected conditions into account.
19 Citations
18 Claims
-
1. An activity scheduling tool accessible to the crew of a space vehicle, comprising:
-
a first user interface element adapted to receive from a crew member of the space vehicle an indication that a task is to be scheduled or rescheduled, and an indication of at least one level of vehicle resources required for the task; a second user interface element adapted to provide to the crew member of the space vehicle an indication that the task can or cannot be scheduled within the bounds of a dependency, condition, or vehicle resource associated with the task, wherein the second user interface element includes an indication that the task has been scheduled for an appointed time, and further includes a graphical display of available vehicle resources at the appointed time; and wherein the second user interface element displays a mission timeline, the mission timeline providing at least one time reference selected from the group consisting of;
mission elapsed time (“
MET”
), coordinated universal time (“
UTC”
) and the time at Mission Control Center (“
MCC”
);wherein said first user interface element and said second user interface element are generated on at least one particular machine and tangibly displayed on at least one display device, said at least one particular machine comprising at least one physical computing device. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14)
-
-
15. An activity scheduling tool accessible to a person responsible for the performance of an activity within a manned or unmanned space craft, comprising:
-
a task definition user interface adapted to receive from a person on a space vehicle responsible for conducting a task an indication that the task is to be scheduled or rescheduled, the task definition user interface being further adapted to receive from the person on the space vehicle an indication of at least one level of resources required for the task; code for utilizing said indication of said at least one level of resources required for the task to automatically assign a scheduled time to said task; wherein the task definition user interface element includes an indication that the task has been scheduled for an appointed time, and further includes a graphical display of available vehicle resources at the appointed time; and
,a user interface element for displaying a mission timeline, wherein the mission timeline provides at least one time reference selected from the group consisting of;
mission elapsed time (“
MET”
), coordinated universal time (“
UTC”
) and the time at Mission Control Center (“
MCC”
);wherein said task definition user interface and said user interface element for displaying a mission timeline are generated on at least one particular machine and tangibly displayed on at least one display device, said at least one particular machine comprising at least one physical computing device. - View Dependent Claims (16, 17, 18)
-