Device and method of planning and managing real-time postal delivery work
First Claim
Patent Images
1. A device for planning and managing real-time postal delivery work, the device comprising:
- a receipt and sorting work quantity information acquiring and transmitting block that sorts quantity information by types after a post office and a mail center perform receipt, collection, and sorting work;
a postal logistics operating block that transmits, to a terminal of each delivery post office, the quantity information from the receipt and sorting work quantity information acquiring and transmitting block to use as calculation criterion information of a scheduled delivery quantity for formulating a real-time delivery plan;
a real-time postal logistics delivery planning and managing block that sorts the quantity information from the receipt and sorting work quantity information acquiring and transmitting block, performs calculation of delivery-zone-based and delivery-route-based scheduled delivery quantities, detection of an excess of delivery workload, calculation of the quantities of entrusted and residential delivery zones, and calculation of the quantities of delivery-zone-based intermediate depositories, generates a delivery route in consideration of a criterion date of special mail item traffic quality and then calculates a general mail item delivery quantity, and provides a terminal of a postman with information about the postal delivery work; and
a delivery and collection work information acquiring and transmitting block that registers a delivery location and a delivery quantity through barcode or RFID tag recognition at a delivery completion location during the postal delivery work with reference to the delivery route and the quantity information generated by the real-time postal logistics delivery planning and managing block, confirms a collection box and registers information about a collection quantity at a delivery location at which collection is to be performed, during the collection work, and transmits the registration results to the real-time postal logistics delivery planning and managing block.
1 Assignment
0 Petitions
Accused Products
Abstract
The present invention relates to a system and method of planning and managing real-time postal delivery work that formulates a delivery plan according to a delivery workload in real time, provides information about the delivery plan, and provides and manages information about collection work of returned and confirmed mail items.
60 Citations
19 Claims
-
1. A device for planning and managing real-time postal delivery work, the device comprising:
-
a receipt and sorting work quantity information acquiring and transmitting block that sorts quantity information by types after a post office and a mail center perform receipt, collection, and sorting work; a postal logistics operating block that transmits, to a terminal of each delivery post office, the quantity information from the receipt and sorting work quantity information acquiring and transmitting block to use as calculation criterion information of a scheduled delivery quantity for formulating a real-time delivery plan; a real-time postal logistics delivery planning and managing block that sorts the quantity information from the receipt and sorting work quantity information acquiring and transmitting block, performs calculation of delivery-zone-based and delivery-route-based scheduled delivery quantities, detection of an excess of delivery workload, calculation of the quantities of entrusted and residential delivery zones, and calculation of the quantities of delivery-zone-based intermediate depositories, generates a delivery route in consideration of a criterion date of special mail item traffic quality and then calculates a general mail item delivery quantity, and provides a terminal of a postman with information about the postal delivery work; and a delivery and collection work information acquiring and transmitting block that registers a delivery location and a delivery quantity through barcode or RFID tag recognition at a delivery completion location during the postal delivery work with reference to the delivery route and the quantity information generated by the real-time postal logistics delivery planning and managing block, confirms a collection box and registers information about a collection quantity at a delivery location at which collection is to be performed, during the collection work, and transmits the registration results to the real-time postal logistics delivery planning and managing block. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19)
-
Specification