×

Burnout time estimation and early thrust termination determination for a boosting target

  • US 8,134,103 B2
  • Filed: 12/27/2006
  • Issued: 03/13/2012
  • Est. Priority Date: 12/27/2006
  • Status: Active Grant
First Claim
Patent Images

1. A method for estimating staging of a boosting target, said method comprising the steps of:

  • sensing position of the boosting target from moment to moment to thereby generate target position information;

    generating current stage state estimates including position, velocity, time index error de{circumflex over (l)}T into a thrust acceleration template, and motor scale factor {circumflex over (K)};

    determining estimated burnout time tBOEst of the current stage by

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×