Permeability flow balancing within integral screen joints
First Claim
Patent Images
1. A steam assisted gravity drainage system in a formation comprising:
- a heated fluid injection well having a tubular including permeability control, one or more open hole anchors restricting thermal growth of the tubular and one or more baffles directing heated fluid application to target areas of the formation; and
a production well in fluid collecting proximity to the injection well the production well having a tubular with permeability control, one or more open hole anchors and one or more baffles;
wherein the one or more baffles of at least one of the injection well and the production well are open hole baffles having a tapered cross-section including a substantially pointed end contacting the formation.
1 Assignment
0 Petitions
Accused Products
Abstract
A SAGD system in a formation including a heated fluid injection well having a tubular including permeability control, one or more open hole anchors restricting thermal growth of the tubular and one or more baffles directing heated fluid application to target areas of the formation; a production well in fluid collecting proximity to the injection well the production well having a tubular with permeability control, one or more open hole anchors and one or more baffles.
261 Citations
12 Claims
-
1. A steam assisted gravity drainage system in a formation comprising:
-
a heated fluid injection well having a tubular including permeability control, one or more open hole anchors restricting thermal growth of the tubular and one or more baffles directing heated fluid application to target areas of the formation; and a production well in fluid collecting proximity to the injection well the production well having a tubular with permeability control, one or more open hole anchors and one or more baffles; wherein the one or more baffles of at least one of the injection well and the production well are open hole baffles having a tapered cross-section including a substantially pointed end contacting the formation. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
-
Specification