×

System and method for predictive maintenance of a battery assembly using temporal signal processing

  • US 8,154,297 B2
  • Filed: 07/05/2007
  • Issued: 04/10/2012
  • Est. Priority Date: 07/05/2007
  • Status: Active Grant
First Claim
Patent Images

1. A method of monitoring a battery assembly, comprising:

  • monitoring a parameter associated with the battery assembly to obtain a number of monitored parameter samples;

    generating a temporal sequence of monotonically increasing values from the monitored parameter samples, the sequence including at least three values;

    predicting a fault condition of the battery assembly when the temporal sequence of monotonically increasing values indicates a sustained inclination in the monitored parameter toward one of an upper predetermined value or a lower predetermined value, the upper and lower predetermined values selected to correspond to a condition for which the battery is monitored; and

    upon making the prediction, triggering an output to a user.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×