Simultaneous tubular handling system and method
First Claim
1. A system for drilling, said system comprising:
- a drilling deck;
a drilling structure disposed with said drilling deck;
a primary tubular advancing station having a well center and disposed with said drilling structure for advancing a first tubular to said well center;
an auxiliary tubular handling station for handling a second tubular;
said drilling deck having a preparation hole positioned with said auxiliary tubular handling station for receiving a portion of the second tubular;
an auxiliary tubular handling device for positioning the second tubular in a substantially vertical position above said preparation hole;
an auxiliary tubular racking station above said auxiliary tubular handling station for holding the second tubular from said auxiliary tubular handling station, wherein the second tubular is positioned in a substantially vertical position above said preparation hole or held in said auxiliary tubular racking station while the first tubular is independently and simultaneously advanced through said primary tubular advancing station to said well center; and
a bridge racker crane configured to move the second tubular between said auxiliary tubular racking station and said well center, wherein said auxiliary tubular handling device configured to directly position the second tubular with said auxiliary tubular racking station.
10 Assignments
0 Petitions
Accused Products
Abstract
A system and method for building and handling oilfield tubular stands while drilling operations are simultaneously and independently occurring with one drilling deck, one derrick, and one rotary system. An offline guided path horizontal to vertical arm lifts and moves in the same plane tubulars stored horizontally on the catwalk and positions the tubulars vertically directly into a preparation hole for assembling and disassembling tubular stands while online drilling operations are simultaneously being conducted. A stand arm lifts and lowers the tubulars into and out of the adjustable preparation hole, and transports the tubulars for storage to an auxiliary tubular racking station in the upper part of the derrick. A bridge racker crane moves tubular stands from the auxiliary tubular racking station to the top drive or another tubular racking station.
221 Citations
20 Claims
-
1. A system for drilling, said system comprising:
-
a drilling deck; a drilling structure disposed with said drilling deck; a primary tubular advancing station having a well center and disposed with said drilling structure for advancing a first tubular to said well center; an auxiliary tubular handling station for handling a second tubular; said drilling deck having a preparation hole positioned with said auxiliary tubular handling station for receiving a portion of the second tubular; an auxiliary tubular handling device for positioning the second tubular in a substantially vertical position above said preparation hole; an auxiliary tubular racking station above said auxiliary tubular handling station for holding the second tubular from said auxiliary tubular handling station, wherein the second tubular is positioned in a substantially vertical position above said preparation hole or held in said auxiliary tubular racking station while the first tubular is independently and simultaneously advanced through said primary tubular advancing station to said well center; and a bridge racker crane configured to move the second tubular between said auxiliary tubular racking station and said well center, wherein said auxiliary tubular handling device configured to directly position the second tubular with said auxiliary tubular racking station. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. A method for moving a plurality of tubulars to a borehole from a drilling deck, said method being perfomed, at least partially, from a primary tubular advancing station and, at least partially, from an auxiliary tubular handling station, the method comprising the steps of:
-
(a) drilling the borehole through a well center in the drilling deck; (b) moving a first tubular with said primary tubular advancing station to said well center in a substantially vertical first plane comprising said well center; and (c) during at least a portion of the time for performing steps (a) and (b), (i) moving a second tubular in a substantially vertical second plane so as not to intersect said first plane;
(ii) positioning a portion of the second tubular in a preparation hole substantially in said second plane in the drilling deck; and
(iii) lifting the second tubular to an auxiliary tubular racking station, wherein step (c) is performed independently of and during at least a portion of the same time as steps (a) and (b). - View Dependent Claims (11, 12, 13, 14, 15, 16, 17)
-
-
18. A system for drilling, said system comprising:
-
a drilling deck having a well center; a drilling structure disposed with said drilling deck; a primary tubular advancing station for advancing a first tubular from a substantially horizontal position to a substantially vertical position above said well center; a stand arm disposed on said drilling deck for connecting a second tubular with a third tubular while the second tubular is in a substantially vertical position, wherein said stand aim is configured to operate during said primary tubular advancing station advancing the first tubular to said well center and independently of said primary tubular advancing station; a first tubular racking station above said drilling deck for holding the second tubular from said stand arm, wherein said stand arm is configured to directly position the second tubular with said first tubular racking station; and a bridge racker crane configured to move the second tubular between said first tubular racking station and said well center. - View Dependent Claims (19, 20)
-
Specification