×

System for scheduling using an external calendaring service

  • US 8,195,309 B2
  • Filed: 07/21/2009
  • Issued: 06/05/2012
  • Est. Priority Date: 07/21/2009
  • Status: Active Grant
First Claim
Patent Images

1. A building control system incorporating an external calendar service, comprising:

  • a schedule subsystem;

    a schedule synchronization subsystem connected to the schedule subsystem; and

    an external calendar configuration subsystem connected to the schedule synchronization subsystem; and

    wherein;

    the schedule subsystem comprises;

    a building schedule mechanism for activating different subsystems in a building based on a configuration of a building schedule; and

    a schedule change mechanism for creating, configuring and/or changing the building schedule;

    the schedule synchronization subsystem comprises a coordination mechanism for coordinating an overall schedule synchronization process between the schedule subsystem and the external calendar configuration subsystem; and

    the external calendar configuration subsystem comprises a normalization mechanism for normalizing a data model of an external calendar configuration into a data model of a specific building control schedule.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×