×

Electric vehicle profiles for power grid operation

  • US 8,232,763 B1
  • Filed: 05/20/2011
  • Issued: 07/31/2012
  • Est. Priority Date: 05/20/2011
  • Status: Active Grant
First Claim
Patent Images

1. A system, comprising:

  • at least one memory that stores computer-executable instructions; and

    at least one processor configured to access the at least one memory, wherein the at least one processor is configured to execute the computer-executable instructions to;

    receive vehicle information based at least in part on at least one vehicle;

    receive other information based at least in part on a charging station for the at least one vehicle; and

    transmit the vehicle information and the other information to a data receiving device, wherein the vehicle information and the other information are utilized for planning power allocation on a grid, predicting power usage on the grid, and/or staggering vehicle charging.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×