×

Meter right sizing

  • US 8,269,650 B2
  • Filed: 04/14/2010
  • Issued: 09/18/2012
  • Est. Priority Date: 04/14/2010
  • Status: Active Grant
First Claim
Patent Images

1. A method for selecting an appropriately sized meter for use in a selected application, comprising;

  • associating an encoder-receiver-transmitter (ERT) endpoint with a consumption measuring meter;

    configuring the endpoint to record consumption data for a selectable time period over selectable length time intervals;

    comparing recorded data with known meter specifications; and

    selecting an appropriate meter based on the known meter specifications.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×