×

Predictive analytic method and apparatus

  • US 8,301,628 B2
  • Filed: 09/27/2010
  • Issued: 10/30/2012
  • Est. Priority Date: 01/12/2005
  • Status: Expired due to Fees
First Claim
Patent Images

1. A computer based assessment tool for providing a current project status and predicting a future project status, the tool comprising:

  • a computer memory storing a project ontology framework (POF), wherein the POF has at least one class and subclass;

    one or more computer processors configured to;

    classify a plurality of incoming messages into a class or subclass within the POF based on a source of each of the messages and assign a confidence level to each of the incoming messages based on the classification;

    extracting the current project status from the plurality of incoming messages based on the source and the assigned confidence level of each of the incoming messages;

    input first classified messages with a first assigned confidence level into a matching function that;

    compares the first classified messages to pre-stored data formatted according to the POF,generates a match score, andmodifies an operation of the POF when the match score exceeds a certain threshold;

    inputs second classified messages with a second assigned confidence level to a mapping function that;

    formats the second classified messages according to at least one class within the POF, andinputs the formatted second classified messages into the matching function;

    inputs third classified messages with a third assigned confidence level into a parsing function that;

    parses words and phrases in the third classified messages,generates tags identifying attributes of the parsed words and phrases in the third classified messages, andinputs the third classified messages with the tags into the mapping function, andinputs results of the mapping function corresponding to the third classified messages with the tags into the matching function;

    predicts the future project status based on match score of each of the plurality of incoming messages based on the matching function;

    generates a status matrix providing a multi-relational representation of the current project status and predicted future project status; and

    a display configured to display the status matrix.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×