Management of materials on a construction site
First Claim
Patent Images
1. A computer implemented method for management of materials on a construction site, said method comprising:
- defining at least one cost scenario to move at least one material with at least one vehicle from a vehicle pool;
determining a status of a project which uses the at least one material;
generating a report which identifies a vehicle from said vehicle pool to be utilized and defines a load of the material which is to be moved by said vehicle, according to a mass haul plan, from a first location which is a cut section to a second location which is a fill section;
automatically updating the status of the project based on an actual size and an actual drop-off location of the load of the material moved by said vehicle; and
updating the report based on the updating of the status of the project.
1 Assignment
0 Petitions
Accused Products
Abstract
A computer implemented method and computer system for management of materials on a construction site. In one embodiment, at least one cost scenario is defined for moving at least one material with a vehicle pool. A status of a project which uses the material is then determined. A report is generated which identifies a vehicle of the vehicle pool and defines a load of the material which is to be moved by the vehicle from a first location to a second location.
-
Citations
32 Claims
-
1. A computer implemented method for management of materials on a construction site, said method comprising:
-
defining at least one cost scenario to move at least one material with at least one vehicle from a vehicle pool; determining a status of a project which uses the at least one material; generating a report which identifies a vehicle from said vehicle pool to be utilized and defines a load of the material which is to be moved by said vehicle, according to a mass haul plan, from a first location which is a cut section to a second location which is a fill section; automatically updating the status of the project based on an actual size and an actual drop-off location of the load of the material moved by said vehicle; and updating the report based on the updating of the status of the project. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
-
-
13. A computer implemented system for managing an asset on a construction site, said system comprising:
-
a cost scenario generator configured to define at least one cost scenario to move a material with a vehicle pool; a status determiner configured to determine the status of a project which uses the material, the status determiner automatically updates the status of the project at a user selectable interval based on an actual size and an actual drop-off location of the load of the material moved by said vehicle; and a report generator configured to generate a report which identifies a vehicle from said vehicle pool and defines which load of the material is to be moved by said vehicle, according to a mass haul plan, from a first location which is a cut section to a second location which is a fill section;
wherein the report generator updates the report based on the updates to the status of the project from the status determiner. - View Dependent Claims (14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24)
-
-
25. A computer implemented method for asset management of a material on a construction site, said method comprising:
-
defining a cost to move a material from a first location which is a cut section to a second location which is a fill section based upon the availability of a plurality of vehicles of a vehicle pool; identifying said first location of the material and said second location of the material based upon a current status of said project and a desired status of said project; generating a report which defines a load of the material and selecting a vehicle from said plurality of vehicles to be utilized to move said load of the material, according to a mass haul plan, from said first location to said second location; automatically updating the status of the project based on an actual size and an actual drop-off location of the load of the material moved by said vehicle; and updating the report based on the updating of the status of the project. - View Dependent Claims (26, 27, 28, 29, 30, 31, 32)
-