System and method to schedule resources in delivery of healthcare to a patient
First Claim
1. A method to schedule a plurality of resources in delivery of healthcare to a plurality of patients, the method comprising the steps of:
- identifying an availability of one or more of the resources to deliver the healthcare to each of the plurality of patients; and
through execution of instructions by at least one processor of at least one machine;
calculating a predicted duration to deliver the healthcare to each of the patients;
calculating a schedule including at least one block of time dependent on the predicted duration for at least one of the plurality of resources to deliver healthcare to one or more of the patients;
calculating a confidence level in the schedule, the confidence level including a probability corresponding to one or both of a likelihood of availability or a risk of unavailability with respect to the at least one resource for the at least one block of time of the schedule; and
calculating an update to the likelihood of availability or the risk of unavailability based on actual clinical operations during a period of time covered by the schedule.
0 Assignments
0 Petitions
Accused Products
Abstract
A method to schedule resources in delivery of healthcare to a series of patients is provided. The method comprises the steps of identifying an availability of the series of resources to deliver the healthcare to each patient; calculating a predicted duration to deliver the healthcare to each patient; calculating a schedule including a block of time dependent on the predicted duration for each resource to deliver healthcare to the patient, the block of time including a start time and an end time; calculating a confidence level in the schedule, the confidence level including a probability that one or more of the resources will not be available for the block of time of the schedule or calculating a likelihood that one or more resources will be available for the block of time in the schedule; and outputting the schedule and the confidence level in the schedule for display.
26 Citations
20 Claims
-
1. A method to schedule a plurality of resources in delivery of healthcare to a plurality of patients, the method comprising the steps of:
-
identifying an availability of one or more of the resources to deliver the healthcare to each of the plurality of patients; and through execution of instructions by at least one processor of at least one machine; calculating a predicted duration to deliver the healthcare to each of the patients; calculating a schedule including at least one block of time dependent on the predicted duration for at least one of the plurality of resources to deliver healthcare to one or more of the patients; calculating a confidence level in the schedule, the confidence level including a probability corresponding to one or both of a likelihood of availability or a risk of unavailability with respect to the at least one resource for the at least one block of time of the schedule; and calculating an update to the likelihood of availability or the risk of unavailability based on actual clinical operations during a period of time covered by the schedule. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A method to schedule a plurality of resources in delivery of healthcare to a plurality of patients, the method comprising the steps of:
-
identifying an availability of one or more of the resources to deliver the healthcare to each of the plurality of patients; and through execution of instructions by at least one processor of at least one machine; calculating a predicted duration to deliver the healthcare to each of the patients, wherein the predicted duration is calculated at least in part based on biometric data associated with one or more of the plurality of patients; calculating a schedule including at least one block of time dependent on the predicted duration for at least one of the plurality of resources to deliver healthcare to one or more of the patients; calculating a confidence level in the schedule, the confidence level including a probability corresponding to one or both of a likelihood of availability or a risk of unavailability with respect to the at least one resource for the at least one block of time of the schedule; and displaying or printing the schedule and the confidence level in the schedule. - View Dependent Claims (10)
-
-
11. An article of manufacture comprising:
at least one non-transitory machine readable medium; and
a plurality of computer readable instructions stored on the at least one non-transitory machine readable medium for execution by a processor, the plurality of computer readable instructions, when executed, performing the following steps;identifying an availability of one or more of a plurality of resources to deliver the healthcare to each of a plurality of patients, calculating a predicted duration to deliver the healthcare to each of the patients, calculating a schedule including at least one block of time dependent on the predicted duration for at least one of the plurality of resources to deliver the healthcare to one or more of the patients, calculating a confidence level in the schedule, the confidence level including a probability corresponding to one or both of a likelihood of availability or a risk of unavailability with respect to the at least one resource for the at least one block of time of the schedule, and calculating an update to the likelihood of availability or the risk of unavailability based on actual clinical operations during a period of time covered by the schedule. - View Dependent Claims (12, 13, 14, 15, 16, 17, 18, 19, 20)
Specification