System for supporting carry-in operation planning

  • US 8,326,664 B2
  • Filed: 06/02/2011
  • Issued: 12/04/2012
  • Est. Priority Date: 06/02/2010
  • Status: Expired due to Fees
First Claim
Patent Images

1. A system for supporting carry-in operation planning for carrying one or more carry-in target equipment required for construction of a building, into the building, the system comprising:

  • a storage unit constructed at least in part of memory hardware, configured to store therein;

    information which describes, for each of the carry-in target equipment, a site arrival time which is a period within which the carry-in target equipment is designated to arrive at a construction site, and a carry-in target spot designated for placement of the carry-in target equipment in the building,information which describes, for each of the carry-in target equipment, a temporary placement period which is a period during which the carry-in target equipment is designated to be temporarily placed in a temporary placement area differing from the carry-in target spot, andinformation which describes, for each of the carry-in target equipment, a carry-in space available period which is a period during which a floor representing the carry-in target spot in the building, has already been constructed and a space above the floor is free and open to accommodate movement of the carry-in target equipment; and

    a control unit constructed at least in part of processor hardware and configured to perform operations of;

    acquiring, from the storage unit, the site arrival time, the temporary placement period, and the carry-in space available period, of a specified carry-in target equipment specified by an input from the input unit, and,upon the conditions that;

    the site arrival time has at least an arrival time portion overlapping with the temporary placement period;

    the temporary placement period has at least a temporary placement time portion overlapping with the carry-in space available period; and

    a time of the arrival time portion is earlier than the temporary placement time portion, then determining the temporary placement time portion as a carry-in ready period of the specified carry-in target equipment, the carry-in ready period being a period during which the carry-in target equipment is designated to be carried from the temporary placement area to the carry-in target spot in the building.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×