Wellbore manufacturing processes for in situ heat treatment processes
First Claim
Patent Images
1. A method for making coiled tubing for a wellbore in a formation, comprising:
- assessing properties of at least a first portion of a treatment area in the formation;
making a first coiled tubing at a coiled tubing manufacturing unit based on, at least in part, one or more of the assessed properties of the first portion of the treatment area, wherein the coiled tubing manufacturing site is coupled to the first portion of the treatment area with a coiled tubing transportation system;
transporting the first coiled tubing from the coiled tubing manufacturing unit to the first portion of the treatment area using a transport gantry that moves along a coiled tubing transportation system with the first coiled tubing on a reel on the transport gantry;
coupling the transport gantry to a chilling gantry located at the first portion of the treatment area;
transferring the first coiled tubing from the transport gantry to the drilling gantry;
drilling a first wellbore using the drilling gantry and the first coiled tubing;
returning the reel to the coiled tubing manufacturing unit on the transport gantry after completion of the drilling of the first wellbore using the first coiled tubing;
making a second coiled tubing at the coiled tubing manufacturing unit based on, at least in part, the assessed properties of the first portion of the treatment area; and
transporting the second coiled tubing from the coiled tubing manufacturing unit to the first portion of the treatment area using the transport gantry that moves along the coiled tubing transportation system with the second coiled tubing on the reel on the transport gantry;
coupling the transport gantry to the drilling gantry located at the first portion of the treatment area;
transferring the second coiled tubing from the transport gantry to the drilling gantry; and
drilling a second wellbore using the drilling gantry and the second coiled tubing.
1 Assignment
0 Petitions
Accused Products
Abstract
A method includes making coiled tubing at a coiled tubing manufacturing unit coupled to a coiled tubing transportation system. One or more coiled tubing reels are transported from the coiled tubing manufacturing unit to one or more moveable well drilling systems using the coiled tubing transportation system. The coiled tubing transportation system runs from the tubing manufacturing unit to one or more movable well drilling systems, and then back to the coiled tubing manufacturing unit.
1072 Citations
12 Claims
-
1. A method for making coiled tubing for a wellbore in a formation, comprising:
-
assessing properties of at least a first portion of a treatment area in the formation; making a first coiled tubing at a coiled tubing manufacturing unit based on, at least in part, one or more of the assessed properties of the first portion of the treatment area, wherein the coiled tubing manufacturing site is coupled to the first portion of the treatment area with a coiled tubing transportation system; transporting the first coiled tubing from the coiled tubing manufacturing unit to the first portion of the treatment area using a transport gantry that moves along a coiled tubing transportation system with the first coiled tubing on a reel on the transport gantry; coupling the transport gantry to a chilling gantry located at the first portion of the treatment area; transferring the first coiled tubing from the transport gantry to the drilling gantry; drilling a first wellbore using the drilling gantry and the first coiled tubing; returning the reel to the coiled tubing manufacturing unit on the transport gantry after completion of the drilling of the first wellbore using the first coiled tubing; making a second coiled tubing at the coiled tubing manufacturing unit based on, at least in part, the assessed properties of the first portion of the treatment area; and transporting the second coiled tubing from the coiled tubing manufacturing unit to the first portion of the treatment area using the transport gantry that moves along the coiled tubing transportation system with the second coiled tubing on the reel on the transport gantry; coupling the transport gantry to the drilling gantry located at the first portion of the treatment area; transferring the second coiled tubing from the transport gantry to the drilling gantry; and drilling a second wellbore using the drilling gantry and the second coiled tubing. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A method for making coiled tubing and transporting such coiled tubing to a well, comprising:
-
drilling at least a portion of a first well in a treatment area using a drilling gantry; assessing properties of the first well; making a first coiled tubing at a coiled tubing manufacturing unit based on, at least in part, the assessed properties of the first well, wherein the coiled tubing manufacturing unit is coupled to the first well with a coiled tubing transportation system; transporting the first coiled tubing from the coiled tubing manufacturing unit to the first well using a transport gantry that moves along the coiled tubing transportation system; coupling the transport gantry to the drilling gantry located at the first well; transferring the first coiled tubing from the transport gantry to the drilling gantry; completing drilling of the first well using the drilling gantry and the first coiled tubing; drilling at least a portion of a second well in the treatment area using the drilling gantry; assessing properties of the second well; making a second coiled tubing at the coiled tubing manufacturing unit based on, at least in part, the assessed properties of the second well, wherein the coiled tubing manufacturing unit is coupled to the second well with the coiled tubing transportation system; and transporting the second coiled tubing from the coiled tubing manufacturing unit to the second well using the transport gantry. - View Dependent Claims (7, 8, 9, 10, 11, 12)
-
Specification