×

Wellbore manufacturing processes for in situ heat treatment processes

  • US 8,327,681 B2
  • Filed: 04/18/2008
  • Issued: 12/11/2012
  • Est. Priority Date: 04/20/2007
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for making coiled tubing for a wellbore in a formation, comprising:

  • assessing properties of at least a first portion of a treatment area in the formation;

    making a first coiled tubing at a coiled tubing manufacturing unit based on, at least in part, one or more of the assessed properties of the first portion of the treatment area, wherein the coiled tubing manufacturing site is coupled to the first portion of the treatment area with a coiled tubing transportation system;

    transporting the first coiled tubing from the coiled tubing manufacturing unit to the first portion of the treatment area using a transport gantry that moves along a coiled tubing transportation system with the first coiled tubing on a reel on the transport gantry;

    coupling the transport gantry to a chilling gantry located at the first portion of the treatment area;

    transferring the first coiled tubing from the transport gantry to the drilling gantry;

    drilling a first wellbore using the drilling gantry and the first coiled tubing;

    returning the reel to the coiled tubing manufacturing unit on the transport gantry after completion of the drilling of the first wellbore using the first coiled tubing;

    making a second coiled tubing at the coiled tubing manufacturing unit based on, at least in part, the assessed properties of the first portion of the treatment area; and

    transporting the second coiled tubing from the coiled tubing manufacturing unit to the first portion of the treatment area using the transport gantry that moves along the coiled tubing transportation system with the second coiled tubing on the reel on the transport gantry;

    coupling the transport gantry to the drilling gantry located at the first portion of the treatment area;

    transferring the second coiled tubing from the transport gantry to the drilling gantry; and

    drilling a second wellbore using the drilling gantry and the second coiled tubing.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×