Reduced carbon footprint settable compositions for use in subterranean formations
First Claim
1. A method of cementing in a subterranean formation comprising:
- calculating a total carbon footprint of a settable composition comprising hydraulic cement, wherein the calculating the total carbon footprint is based on carbon dioxide produced in production of the hydraulic cement;
reducing the total carbon footprint of the settable composition by replacing at least a portion of the settable composition with an additive, wherein the additive comprises cement kiln dust;
placing the settable composition in the subterranean formation, wherein the placing the settable composition in the subterranean formation comprises placing the settable composition in an annulus between the subterranean formation and a pipe string; and
allowing the settable composition to set in the subterranean formation.
1 Assignment
0 Petitions
Accused Products
Abstract
An example method of cementing in a subterranean formation includes determining a settable composition for use in the subterranean formation; calculating a total carbon footprint of the settable composition; determining at least one additive for use in the settable composition, wherein the additive replaces at least a portion of the settable composition and reduces the total carbon footprint of the settable composition; preparing the settable composition comprising the additive; placing the settable composition comprising the additive in the subterranean formation; and allowing the settable composition comprising the additive to set in the subterranean formation. Additional embodiments of the present invention include determining an amount of reduction in the carbon footprint of the settable composition; and/or communicating the amount of reduction in the carbon footprint of the settable composition to a customer or end user.
342 Citations
17 Claims
-
1. A method of cementing in a subterranean formation comprising:
-
calculating a total carbon footprint of a settable composition comprising hydraulic cement, wherein the calculating the total carbon footprint is based on carbon dioxide produced in production of the hydraulic cement; reducing the total carbon footprint of the settable composition by replacing at least a portion of the settable composition with an additive, wherein the additive comprises cement kiln dust; placing the settable composition in the subterranean formation, wherein the placing the settable composition in the subterranean formation comprises placing the settable composition in an annulus between the subterranean formation and a pipe string; and allowing the settable composition to set in the subterranean formation. - View Dependent Claims (2, 3, 4, 5, 6, 7, 13, 14, 15)
-
-
8. A method of cementing in a subterranean formation comprising:
-
providing a settable composition comprising hydraulic cement; including an additive in the settable composition, wherein the additive comprises cement kiln dust; calculating a carbon footprint reduction for the settable composition based on carbon dioxide produced in production of the hydraulic cement and the additive; placing the settable composition in the subterranean formation, wherein the placing the settable composition in the subterranean formation comprises placing the settable composition in an annulus between the subterranean formation and a pipe string; and allowing the settable composition to set in the subterranean formation. - View Dependent Claims (9, 10, 11, 12, 16, 17)
-
Specification