×

Method for replacing a load control device of a load control system

  • US 8,368,307 B2
  • Filed: 10/29/2010
  • Issued: 02/05/2013
  • Est. Priority Date: 03/12/2005
  • Status: Active Grant
First Claim
Patent Images

1. A method for replacing a load control device in a load control system including a first load control device having a first unique identifier associated therewith and a first configuration setting, the load control system further including a bus supply, the first load control device and the bus supply interconnected by a communication bus, the method comprising the steps of:

  • removing the first load control device from the load control system;

    installing a second load control device having a second unique identifier associated therewith in the load control system;

    transmitting an instruction to the bus supply to configure the second load control device with the first configuration setting, the bus supply having stored therein the first unique identifier and first electronic configuration information representing the first configuration setting;

    correlating the second unique identifier with the first unique identifier; and

    configuring the second load control device with the first electronic configuration information stored in the bus supply.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×