×

System and method for dynamic multi-objective optimization of machine selection, integration and utilization

  • US 8,417,360 B2
  • Filed: 09/30/2008
  • Issued: 04/09/2013
  • Est. Priority Date: 08/10/2001
  • Status: Active Grant
First Claim
Patent Images

1. A system comprising:

  • a memory having stored thereon computer-executable components for implementing the system, including;

    a modeling component configured to construct model data representing a production model of a facility, the production model comprising one or more sub-models of a production process that model a source of a factor of production and a sink of the factor of production, and determine first data representing an operating strategy for the production process that satisfies at least two constraints identified by the production model, wherein the at least two constraints are associated with at least one business-level objective and at least one plant-level objective relating to an industrial machine, and wherein the factor of production is at least energy;

    an energy optimization component configured to perform an analysis of the operating strategy in view of an energy demand model of the production process and an energy supply model of the production process, and determine second data representing an energy generating strategy based on the analysis;

    a capacity management component configured to perform a profiling of the at least two constraints based in part on at least one of a current operation of the industrial machine or a predicted operation of the industrial machine,a visualization component configured to render comparison data representing a comparison of a theoretical capacity and a current production rate of the production process; and

    wherein the modeling component is further configured to determine a probability of achieving the at least one business-level objective or the at least one plant-level objective based on an analysis of the production model and to set third data representing an inventory target based on the first data and the second data, and wherein the inventory target controls an asset utilization of the production process; and

    a processor, coupled to the memory, configured to facilitate execution of the computer-executable components.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×