Systems and methods for automated parallelization of transport load builder
First Claim
1. A computer-implemented method for creating a transport load for one or more transfers of goods within a supply chain, the method comprising:
- accessing a parallel processing profile associated with a distribution plan of the supply chain, the distribution plan comprising a plurality of transport load processes executed in parallel, and the parallel processing profile specifying a maximum number of transportation lanes for the transport load processes;
generating, using a processor, lane data associated with transportation lanes of the supply chain, wherein the generating step comprises;
preparing a lanes table for a plurality of transportation lanes, the transportation lanes representing geographic routes between source locations and corresponding destination locations within the supply chain, the lanes table comprising the source locations, the destination locations, and sequence numbers that prioritize the plurality of transportation lanes;
receiving, from a planning computer, a source location within the supply chain;
selecting, from the lanes table, one or more of the transportation lanes for the lane data based on at least the received source location;
filtering the selected transportation lanes based on at least the maximum number of transportation lanes specified by the parallel processing profile; and
storing, in a storage medium, source locations, destination locations, and sequence numbers of the filtered transportation lanes to generate the lane data; and
generating, using the processor, the transport loads based on the lane data associated with the selected transportation lanes by executing the transport load processes in parallel according to the parallel processing profile associated with the distribution plan.
3 Assignments
0 Petitions
Accused Products
Abstract
Systems and methods are provided for creating a transport load for one or more stock transfers. In one exemplary embodiment, the systems and methods may include providing a parallel processing profile to be associated with the distribution plan. The method may also include building one or more packages of one or more transportation lanes, wherein building one or more packages comprises providing a lanes table of the one or more transportation lanes. The lanes table may comprise information associated with each of the one or more transportation lanes. The method may further include selecting the one or more transportation lanes for each package based on the information and the parallel processing profile, and generating the transport load for each package.
-
Citations
45 Claims
-
1. A computer-implemented method for creating a transport load for one or more transfers of goods within a supply chain, the method comprising:
-
accessing a parallel processing profile associated with a distribution plan of the supply chain, the distribution plan comprising a plurality of transport load processes executed in parallel, and the parallel processing profile specifying a maximum number of transportation lanes for the transport load processes; generating, using a processor, lane data associated with transportation lanes of the supply chain, wherein the generating step comprises; preparing a lanes table for a plurality of transportation lanes, the transportation lanes representing geographic routes between source locations and corresponding destination locations within the supply chain, the lanes table comprising the source locations, the destination locations, and sequence numbers that prioritize the plurality of transportation lanes; receiving, from a planning computer, a source location within the supply chain; selecting, from the lanes table, one or more of the transportation lanes for the lane data based on at least the received source location; filtering the selected transportation lanes based on at least the maximum number of transportation lanes specified by the parallel processing profile; and storing, in a storage medium, source locations, destination locations, and sequence numbers of the filtered transportation lanes to generate the lane data; and generating, using the processor, the transport loads based on the lane data associated with the selected transportation lanes by executing the transport load processes in parallel according to the parallel processing profile associated with the distribution plan. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15)
-
-
16. A distribution system for creating a transport load for one or more transfers of goods in a supply chain, the system comprising:
-
a processor; and a memory, wherein the processor and the memory are configured to perform a method comprising; accessing a parallel processing profile associated with a distribution plan of the supply chain, the distribution plan comprising a plurality of transport load processes executed in parallel, and the parallel processing profile specifying a maximum number of transportation lanes for the transport load processes; generating lane data associated with transportation lanes of the supply chain, wherein the generating step comprises; preparing a lanes table for a plurality of transportation lanes, the transportation lanes representing geographic routes between source locations and corresponding destination locations within the supply chain, the lanes table comprising the source locations, the destination locations, and sequence numbers that prioritize the plurality of transportation lanes; receiving, from a planning computer, a source location within the supply chain; selecting, from the lanes table, one or more of the transportation lanes for the lane data based on at least the received source location; filtering the selected transportation lanes based on at least the maximum number of transportation lanes specified by the parallel processing profile; and storing, in a storage medium, source locations, destination locations, and sequence numbers of the filtered transportation lanes to generate the lane data; and generating transport loads based on the lane data associated with the selected transportation lanes by executing the transport load processes in parallel according to the parallel processing profile associated with the distribution plan. - View Dependent Claims (17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30)
-
-
31. A tangible, non-transitory computer-readable medium containing a set of instructions which, when executed, perform a method for creating a transport load for one or more stock transfers of goods in a supply chain, the method comprising:
-
accessing a parallel processing profile associated with a distribution plan of the supply chain, the distribution plan comprising a plurality of transport load processes executed in parallel, and the parallel processing profile specifying a maximum number of transportation lanes for the transport load processes; generating, using a processor, lane data associated with transportation lanes of the supply chain, wherein the generating step comprises; preparing a lanes table for a plurality of transportation lanes, the transportation lanes representing geographic routes between source locations and corresponding destination locations within the supply chain, the lanes table comprising the source locations, the destination locations, and sequence numbers that prioritize the plurality of transportation lanes; receiving, from a planning computer, a source location within the supply chain; selecting, from the lanes table, one or more of the transportation lanes for the lane data based on at least the received source location; filtering the selected transportation lanes based on at least the maximum number of transportation lanes specified by the parallel processing profile; and storing, in a storage medium, source locations, destination locations, and sequence numbers of the filtered transportation lanes to generate the lane data; and generating, using the processor, transport loads based on the lane data associated with the selected transportation lanes by executing the transport load processes in parallel according to the parallel processing profile associated with the distribution plan. - View Dependent Claims (32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45)
-
Specification