×

Integrated materials management for commercial aircraft fleets including access to real-time on-board systems information

  • US 8,423,430 B2
  • Filed: 11/16/2005
  • Issued: 04/16/2013
  • Est. Priority Date: 11/16/2005
  • Status: Active Grant
First Claim
Patent Images

1. A method of managing a supply chain of materials used to service fleet aircraft at multiple geographical service locations for a plurality of customers, said customers operating said fleet aircraft, by a single network integrator at a non-mobile central operations center, said network integrator a separate business entity from said customers, comprising the steps of:

  • (A) said network integrator organizing a network of material suppliers;

    (B) said network integrator maintaining inventories of the materials at customer designated sites, said customer designated sites comprising said multiple geographical service locations;

    (C) said network integrator managing the material suppliers and the inventories at each of the customer designated sites; and

    (D) said network integrator providing the customers with electronic access to real-time data over a shared communications network controlled by said network integrator relating to an operational status of systems on-board the fleet aircraft including said fleet aircraft in flight, the real-time data being useful in performing maintenance requiring the materials maintained in the inventories, said real-time data collected by one or more computer servers at said central operations center controlled by said network integrator, said real-time data wirelessly received from each of said fleet aircraft and converted and stored by said one or more computer servers at said central operations center.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×