×

Method for managing hydrates in subsea production line

  • US 8,430,169 B2
  • Filed: 08/21/2008
  • Issued: 04/30/2013
  • Est. Priority Date: 09/25/2007
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for managing hydrates in a subsea production system, the system having a production facility, an umbilical line for delivering displacement fluids from the production facility, at least one subsea production well, and a single production line for delivering produced fluids to the production facility, comprising:

  • producing hydrocarbon fluids from the at least one subsea production well and through the single production line;

    shutting in the flow of produced fluids from the at least one subsea well and the production line;

    depressurizing the production line to substantially reduce a solution gas concentration in the produced hydrocarbon fluids;

    repressurizing the production line to urge any gas remaining in a free-gas phase in the produced fluids within the production line back into solution; and

    displacing production fluids within the production line by moving the displacement fluids from a service line within the umbilical line and into the production line, the displacement fluids comprising a hydrocarbon-based fluid having a low dosage hydrate inhibitor (LDHI).

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×