×

Laying and protecting cable into existing covering surfaces

  • US 8,480,332 B2
  • Filed: 09/23/2010
  • Issued: 07/09/2013
  • Est. Priority Date: 09/23/2009
  • Status: Active Grant
First Claim
Patent Images

1. A method for constructing an underground cable line in-situ through an existing covering surface disposed over a subsurface below the existing covering surface, the existing covering surface comprising a first material selected from a group consisting of pavement, paving, concrete, asphalt, blacktop, cobblestone and brick, and the subsurface comprising a second material different from the first material, the method comprising:

  • A) cutting the existing covering surface to create a void through the existing covering surface and into the second material of the subsurface below the existing covering surface and thereby creating a volume of debris, wherein the void has a depth greater than the existing covering surface and a width between 1.27 cm and 3.8 cm;

    B) evacuating the volume of debris from at least the void;

    C) laying a cable into the void;

    D) flowing a non-shrinking composition into a portion of the void so as to encase the cable; and

    E) after hardening of the non-shrinking composition, applying a topping material to a remaining portion of the void.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×