×

Environmental load amount calculation method, execution program therefor, and execution apparatus therefor

  • US 8,483,860 B2
  • Filed: 07/31/2009
  • Issued: 07/09/2013
  • Est. Priority Date: 10/17/2008
  • Status: Expired due to Fees
First Claim
Patent Images

1. An article comprising a non-transitory computer readable medium having, executable instructions stored thereon for an environmental load amount calculation program that calculates an amount of an environmental load of types of products produced in an object production line that comprises processing apparatuses, wherein the environmental load amount calculation program when executed by a computer, causes the computer to perform:

  • a first relation acquisition step, in which, for each type of processing apparatus characteristic, an apparatus characteristic-coefficient relation that indicates a relation between the processing apparatus characteristic in question and a coefficient indicating a ratio of an actual environmental load to a rated value of environmental load of a processing apparatus is acquired and stored in a storage unit of the computer;

    a second relation acquisition step, in which, for each type of processing apparatus characteristic, an apparatus characteristic-correlated specification item relation that relates the processing apparatus characteristic in question and a specification item having prescribed correlation with an amount of an environmental load of a processing apparatus among a plurality of product specification items is acquired and stored in the storage unit;

    a receiving step, in which a receiving means of the computer receives;

    an amount of a line environmental load as an actual amount of an environmental load for a prescribed period in the object production line;

    each type of processing apparatus characteristic of each processing apparatus constituting the object production line;

    a rated value of environmental load of each type of processing apparatus constituting the object production line; and

    numerical data of each specification item for each type of product produced in the object production line;

    a coefficient setting step, in which, for each type of processing apparatus constituting the object production line, the apparatus characteristic-coefficient relation, which is stored in the storing, unit, for each type of processing characteristic is used to determine a coefficient corresponding to the apparatus characteristic, which is received in the receiving step;

    a line load allotting step, in which the line environmental load received in the receiving step is allotted to each processing apparatus by using the rated value of environmental load and the coefficient for each type of processing apparatus constituting the object production line, in order to obtain an apparatus load of each processing apparatus;

    a correlated specification item setting step, in which, for each type of processing apparatus constituting the object production line, a product correlated specification item corresponding to the apparatus characteristic, which is received. in the receiving step, is determined by using the apparatus characteristic-correlated specification item relation, which is stored in the storage unit, for each type of processing apparatus;

    an apparatus load allotting step, in which, by using numerical data of each product concerning the correlated specification item determined for each type of processing apparatus constituting the object production line among the numerical data, which are received in the receiving step, of the plurality of specification items of each type of product, the apparatus load, which is obtained in the line load allotting step, for each processing apparatus is allotted to each product on a basis of correlation between the numerical data of each product and an apparatus load required for processing that product, in order to obtain a product load for each product and for each type of processing apparatus; and

    a production environmental load amount calculation step, in which the product load obtained in the apparatus load allotting step for each apparatus and for each product is used to obtain an amount of a production environmental load required for producing a product in the object production line for each product, and the obtained production environmental load amount for each product is stored in the storage unit.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×