System and method for predicting transient cooling performance for a data center
First Claim
Patent Images
1. A computer-implemented method for evaluating transient cooling performance of a data center, the method comprising:
- receiving input data from a storage device, the input data including data center architecture information and operating data;
performing real-time transient cooling performance calculations for the data center using the input data, the real-time transient cooling performance calculations include calculating a rate of change of at least one predicted temperature in the data center during a power outage of the data center; and
displaying results of the real-time transient cooling performance calculations in a data center management system, wherein the results include a maximum predicted temperature of the data center following the power outage of the data center.
2 Assignments
0 Petitions
Accused Products
Abstract
A system and method is provided for evaluating the transient cooling performance of a data center. In one version, the method includes receiving input data from a storage device, the input data including data center architecture information and operating data, displaying a model of the data center, performing real-time transient cooling performance calculations for the data center using the input data, and displaying results of the real-time transient cooling performance calculations, wherein the results include a maximum predicted temperature of the data center following a power outage of the data center.
127 Citations
20 Claims
-
1. A computer-implemented method for evaluating transient cooling performance of a data center, the method comprising:
-
receiving input data from a storage device, the input data including data center architecture information and operating data; performing real-time transient cooling performance calculations for the data center using the input data, the real-time transient cooling performance calculations include calculating a rate of change of at least one predicted temperature in the data center during a power outage of the data center; and displaying results of the real-time transient cooling performance calculations in a data center management system, wherein the results include a maximum predicted temperature of the data center following the power outage of the data center. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A system for evaluating transient cooling performance of a data center, the system comprising:
-
a storage device; a display; a controller coupled to the storage device and the display and configured to; receive input data from the storage device, the input data including data center architecture information and operating data; perform real-time transient cooling performance calculations for the data center using the input data, the real-time transient cooling performance calculations include calculating a rate of change of at least one predicted temperature in the data center during a power outage of the data center; and control the display to display results of the real-time transient cooling performance calculations in a data center management system, wherein the results include a maximum predicted temperature of the data center following the power outage of the data center. - View Dependent Claims (10, 11, 12, 13, 14, 15)
-
-
16. A non-transitory computer readable medium having stored thereon sequences of instruction including instructions that will cause a processor to:
-
receive input data regarding a layout of a data center and cooling systems contained in the data center; store the input data; perform real-time transient cooling performance calculations for the data center using the input data, the real-time transient cooling performance calculations include calculating a rate of change of at least one predicted temperature in the data center during a power outage of the data center; and control a display to display results of the real-time transient cooling performance calculations in a data center management system, wherein the results include a maximum predicted temperature of the data center following the power outage of the data center. - View Dependent Claims (17, 18, 19, 20)
-