×

Wellbore fluid treatment process and installation

  • US 8,511,394 B2
  • Filed: 06/08/2009
  • Issued: 08/20/2013
  • Est. Priority Date: 06/06/2008
  • Status: Expired due to Fees
First Claim
Patent Images

1. A wellbore installation in a wellbore liner including an inner diameter, a first perforated interval and a second perforated interval positioned uphole from the first perforated interval, the wellbore installation comprising:

  • a first tubular member installed over the first perforated interval in the inner diameter of the wellbore liner, the tubular member including an open upper end adjacent an upper limit of the first perforated interval, an open lower end adjacent a lower limit of the perforated interval, a wall extending from the open upper end to the open lower end and a port through the wall;

    a first closure for the port installed in the first tubular member and actuable between a closed position closing the port and an open position wherein the port is open; and

    a sealing element settable to create a seal between the tubular member and the wellbore liner in a position between the open upper end and the first perforated interval and between the open lower end and the first perforated interval; and

    a second tubular member installed over the second perforated interval in the inner diameter of the wellbore liner, the second tubular member being separate from the first tubular member and including an open uphole end adjacent an upper limit of the second perforated interval, an open downhole end adjacent a lower limit of the perforated interval, a wall extending from the open uphole end to the open downhole end and a port through the wall;

    a closure for the port installed in the second tubular member and actuable between a closed position closing the port and an open position wherein the port is open; and

    a sealing element settable to create a seal between the tubular member and the wellbore liner in a position between the open uphole end and the second perforated interval and between the open downhole end and the second perforated interval, the second tubular member spaced from the first tubular member and the closure of the second tubular member being actuable separately from the closure of the first tubular member.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×