Control and protection system of converter valve operation test equipment

  • US 8,515,561 B2
  • Filed: 12/24/2009
  • Issued: 08/20/2013
  • Est. Priority Date: 12/23/2009
  • Status: Active Grant
First Claim
Patent Images

1. A control and protection system of converter operation test equipment includes human-machine interface element, synchronization element, signal acquisition element, data aggregation element, conditioning element, protecting element, wave form recording element, wave form monitor element, on-off input element, on-off output element, vale based element (VBE), high direct current supply power system controller, high voltage supply system controller, current surge circuit controller, impulse circuit controller, test converter valve water cooling controller and test equipment water cooling system controller;

  • above elements process data and logical judgment in certain timing order, said each element communicates information with each other through electric signal, optical fiber signal and by “

    deploy”

    , “

    interface”

    , “

    recording wave” and



    long distance”

    four independent CAN buses;

    as a result, the test converter valve and auxiliary valve can be orderly trigged according to set timing order;

    various required voltage, current and heat for the test converter valves can be produced to carry out the operation test;

    at the same time this system can also immediate monitor test equipment main circuit on-off condition and important simulation parameters, when operation is abnormal, protective measures can be made actively and timely,said timing of various elements processing data and judging logic on set order is described as below;

    (1) synchronization element produces test needed “

    trigging synchronization”

    signal and “

    signal acquisition”

    signal according to test equipment high voltage supply power system or high current power system 50 Hz alternating source;



    trigging synchronization”

    signal is used for synchronizing whole test equipment working, therefore one test period is one “

    trigging synchronization”

    signal period;



    signal acquisition”

    signal is used for synchronizing signal acquisition element and data aggregation element;

    (2) signal acquisition element receives main circuit various sensors input simulation signals, trigs inner digital-analog converter according to “

    signal acquisition”

    signal which is sent from synchronization element, transform the simulation signals into digital signal and sends to data aggregation element;

    (3) data aggregation element keeps pace with signal acquisition element by “

    signal acquisition”

    signal, process signals which are sent by signal acquisition element such as elimination temperature drift, digital filter, calibrated signal and so on, at last sends the “

    acquisition results”

    to conditioning element, protecting element and wave form recording element;

    (4) conditioning element controls the present test process according to the “

    acquisition results”

    sent by data aggregation element, on-off information sent by on-off input element and VBE element, and control information sent by human-machine interface element through “

    deploy CAN bus”

    , changes each converter valve trigging timing, sends the timing signal to on-off input;

    when the converter valve trigging timing is changed, conditioning element will send recording wave command to wave form recording element through “

    interface CAN bus”

    to effectively monitor the working condition of main circuit;

    (5) protecting element judges the test equipment abnormal or not from “

    acquisition results”

    sent by data aggregation element, on-off information sent by on-off input element and VBE element, and protection parameters sent by human-machine interface element through “

    deploy CAN bus”

    ;

    if abnormal exits, it will make protective measures and send on-off action command to on-off output element through “

    interface CAN bus”

    ;

    when abnormal occurs, protecting element send recording wave command to wave form recording element through “

    interface CAN bus”

    to effectively monitor the protection condition of main circuit;

    (6) wave form recording element processes “

    acquisition results”

    sent by data aggregation element and on-off information sent by on-off input element and VBE element, starts the record process according to conditioning element and protecting element commands, and sends record wave data to wave form monitor element though “

    recording wave CAN bus”

    ;

    (7) on-off input element acquires various on-off information of the main circuit, sends to conditioning element, protecting element and wave form recording element through “

    interface CAN bus”

    , sends to human-machine interface element through “

    deploy CAN bus”

    , at the same time sends “

    trigging timing”

    signal produced by conditioning element to corresponding VBE element and high direct current supply power controller;

    (8) on-off output element performs on-off action commands sent by protecting element through “

    interface CAN bus”

    ;

    (9) in test circuit each converter corresponds a VBE element, each VBE element confirms trigging number and phase of the converter during each trigging period according to the “

    trigging timing”

    sent by conditioning element, sends trigging impulse to converter valves through optical fiber, at the same time monitors the working condition of each converter valve;

    once abnormal condition takes place, VBE element reports related information to conditioning element and protecting element through “

    interface CAN bus”

    ;

    (10) high direct current supply power system controller, high voltage supply system controller, current surge circuit controller, impulse circuit controller, test converter valve water cooling controller and test equipment water cooling system controller receive the commands from “

    long distance CAN bus”

    sent by human-machine interface element, respectively controls corresponding main devices, at the same time monitors corresponding main devices and sent monitored information to human-interface element through “

    long distance CAN bus”

    .

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×