Drilling rig assembly method and apparatus
First Claim
Patent Images
1. A method of incrementally raising a rig floor, the method comprising:
- contacting one or more lifting cylinders, the one or more lifting cylinders attached to a base structure, with one or more rig floor load points on the rig floor positioned above the base structure;
extending one or more arms of the one or more lifting cylinders against the one or more rig floor load points and raising the rig floor above the base structure a specified increment;
inserting a first box between the base structure and the rig floor, wherein the rig floor is raised to a specified height;
contacting one or more first box load points on the first box with the one or more lifting cylinders;
extending the one or more arms of the one or more lifting cylinders and raising the rig floor above the base structure by a specified increment; and
inserting one or more additional boxes between the base structure and the rig floor, wherein the rig floor is raised to a specified height.
5 Assignments
0 Petitions
Accused Products
Abstract
A method to assemble a drilling rig includes providing a base structure of the drilling rig, stacking a rig floor including a derrick on the base structure, actuating lifting cylinders to lift the rig floor above the base structure, inserting at least one first upper box between the base structure and the rig floor, and retracting the lifting cylinders to set the rig floor atop the at least one first upper box.
-
Citations
3 Claims
-
1. A method of incrementally raising a rig floor, the method comprising:
-
contacting one or more lifting cylinders, the one or more lifting cylinders attached to a base structure, with one or more rig floor load points on the rig floor positioned above the base structure; extending one or more arms of the one or more lifting cylinders against the one or more rig floor load points and raising the rig floor above the base structure a specified increment; inserting a first box between the base structure and the rig floor, wherein the rig floor is raised to a specified height; contacting one or more first box load points on the first box with the one or more lifting cylinders; extending the one or more arms of the one or more lifting cylinders and raising the rig floor above the base structure by a specified increment; and inserting one or more additional boxes between the base structure and the rig floor, wherein the rig floor is raised to a specified height. - View Dependent Claims (2, 3)
-
Specification