×

Dynamic system and method for automated checking and transmitting of damage reports and damage claims

  • US 8,583,458 B2
  • Filed: 12/21/2005
  • Issued: 11/12/2013
  • Est. Priority Date: 12/27/2004
  • Status: Active Grant
First Claim
Patent Images

1. A dynamic system for automated checking and transmitting of damage reports in multi-level damage coverage systems, the system comprising:

  • a plurality of capturing units configured to capture damage records and transmit the damage records to a central unit, the damage records having assigned respective areas for capturing damage records based on first control parameters, a damage record comprising at least one event parameter for the respective area, the capturing units configured to perform an administrative accounting on the damage records including a verification of formal requirements of the damage records, and configured to verify contractual relationships of the damage records and to check whether a damage record is related to an isolated damage event or to additional damage events; and

    the central unit bidirectionally connected via a network to the capturing units, at least event parameters being transmittable from the capturing units to the central unit, wherein the central unit includes,a filter module for selecting first and second damage records from among the captured damage records based on at least one threshold value associated with a respective area assigned to the first and second damage records,an analysis module for detecting and eliminating, based on second control parameters, first damage records wrongly captured by means of the capturing units,a regulator module for dynamic adjusting and storing of the at least one threshold value, associated with the respective area associated with the first and second damage records, based on the filtered first damage records, excluding the wrongly captured first damage records, anda transmission module for transmitting the filtered first damage records to an external processing device, the filtered first damage records being released for multi-level damage coverage.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×