×

Simultaneous tubular handling system and method

  • US 8,584,773 B2
  • Filed: 05/09/2012
  • Issued: 11/19/2013
  • Est. Priority Date: 02/23/2007
  • Status: Active Grant
First Claim
Patent Images

1. A system for drilling, said system comprising:

  • a drilling deck having a well center;

    a primary tubular advancing station configured for advancing a first tubular onto said drilling deck from a substantially horizontal position to a substantially vertical position above said well center;

    a stand arm disposed with said drilling deck and configured for handling a second tubular; and

    a guided path horizontal to vertical arm positioned adjacent to said stand arm and configured to guide the second tubular onto said drilling deck from a substantially horizontal position to a substantially vertical position adjacent to said stand arm, wherein said guided path arm is configured to guide the second tubular onto said drilling deck during advancing of the first tubular onto said drilling deck to said well center and said guided path arm is configured to operate independently of said primary tubular advancing station.

View all claims
  • 10 Assignments
Timeline View
Assignment View
    ×
    ×